Find the site.
Follow the ties.

Search Cloud Draw’s joined facility, project, approval, power-evidence, builder, country-rule, and source indexes in one pass. The larger official provider, licence, registration, and sector-agent registry has its own server-side energy search.

Indexed now
Map units
Company labels
Energy relationships
Result categories
Search expressions · phrase, OR, exclusion, and field prefixes

MATCHES / S2

1,043 ways in.

1,043 search results match the current filters.

No keyword yet. Browse by organization, energy role, ISO / RTO region, power class, country rule, and evidence level.

  1. FacilitiesOriginal document

    Locust Grove · Georgia · planned · campus

    300 Marketplace Data Center

    Undisclosed campus developerUnited StatesGeorgiaplannedMW not listed in attached recordMW not listed in the cited source

    MW not listed in the cited source. The DRI locates the project; a daily water figure was not located in the linked report. High Falls site; no water figure.

  2. FacilitiesOriginal document

    Jackson · Georgia · planned · hyperscale facility

    AWS · Butts County Building 1

    Amazon Web ServicesUnited StatesGeorgiaplannedMW not listed in attached recordMW not listed in the cited source

    MW not listed in the cited source. AWS confirmed Georgia infrastructure investment; this site-level water figure is not published. High Falls site; no water figure.

  3. FacilitiesOriginal document

    Forsyth · Georgia · approved / planned · campus

    Forsyth Technology Campus

    Undisclosed campus developerUnited StatesGeorgiaapproved / plannedMW not listed in attached recordMW not listed in the cited source

    MW not listed in the cited source. DRI reports 1.5 MGD demand. The 4 MGD reference is the City of Forsyth withdrawal permit, not a campus cap. Large reported or planned demand.

  4. FacilitiesOriginal document

    Forsyth · Georgia · planned · campus

    Rumble Technology Campus

    Rumble Technology project entityUnited StatesGeorgiaplannedMW not listed in attached recordMW not listed in the cited source

    MW not listed in the cited source. Public project reporting estimates 2 MGD; treat as planned demand, not an EPD site cap. Large reported or planned demand.

  5. FacilitiesOriginal document

    Griffin · Georgia · planned · campus

    Spalding Investments · High Falls Road

    Spalding Investments LLCUnited StatesGeorgiaplannedMW not listed in attached recordMW not listed in the cited source

    MW not listed in the cited source. The county conditions require closed-loop cooling. That is not the same as zero total water use. High Falls site; no water figure.

  6. FacilitiesOriginal document

    Griffin · Georgia · planned · campus

    Strickland Road Farm Data Center

    Undisclosed campus developerUnited StatesGeorgiaplannedMW not listed in attached recordMW not listed in the cited source

    MW not listed in the cited source. The DRI locates the project; a daily water figure was not located in the linked study. High Falls site; no water figure.

  7. Energy organizationsOriginal document

    IPP · EIA reporting entity 67083 · Texas

    1000 Mile Solar, LLC

    1000 Mile Solar, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions300 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 300 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  8. Energy organizationsOriginal document

    IPP · EIA reporting entity 67913 · Illinois

    11601 Copenhagen Ct, LLC

    11601 Copenhagen Ct, LLCUnited StatesIllinois2026-07 to 2027-06 scheduleScheduled grid additions3.5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 3.5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  9. Energy organizationsOriginal document

    IPP · EIA reporting entity 61222 · Arizona, Colorado, Nevada

    174 Power Global Corp.

    174 Power Global Corp.United StatesMultiple states2026-07 to 2027-06 scheduleScheduled grid additions628 MW generation · 128 MW storageGenerator / project developer

    4 scheduled units across 3 plants · 628 MW generation · 128 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  10. Energy organizationsOriginal document

    IPP · EIA reporting entity 63806 · California

    26SB 8me LLC

    26SB 8me LLCUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions500 MW generation · 500 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 500 MW generation · 500 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  11. Energy organizationsOriginal document

    IPP · EIA reporting entity 66818 · Arizona

    301AK 8me LLC

    301AK 8me LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions100 MW generation · 100 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 100 MW generation · 100 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  12. Energy organizationsOriginal document

    IPP · EIA reporting entity 67549 · Illinois

    38DN Asset Management LLC

    38DN Asset Management LLCUnited StatesIllinois2026-07 to 2027-06 scheduleScheduled grid additions10 MW generationGenerator / project developer

    2 scheduled units across 2 plants · 10 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  13. Energy organizationsOriginal document

    IPP · EIA reporting entity 63825 · California

    45MG 8me LLC

    45MG 8me LLCUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions150 MW generation · 113 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 150 MW generation · 113 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  14. Energy organizationsOriginal document

    IPP · EIA reporting entity 67018 · California

    64NB 8me LLC

    64NB 8me LLCUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions120 MW generation · 75 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 120 MW generation · 75 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  15. Energy organizationsOriginal document

    IPP · EIA reporting entity 60796 · California

    91MC 8me LLC

    91MC 8me LLCUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions80 MW generation · 50 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 80 MW generation · 50 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  16. Energy organizationsOriginal document

    IPP · EIA reporting entity 65819 · Texas

    Ables Springs Solar, LLC

    Ables Springs Solar, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions151 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 151 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  17. Energy organizationsOriginal document

    IPP · EIA reporting entity 63004 · New York

    Abundant Solar Power Inc.

    Abundant Solar Power Inc.United StatesNew York2026-07 to 2027-06 scheduleScheduled grid additions20 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 20 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  18. Energy organizationsOriginal document

    IPP · EIA reporting entity 57416 · Kentucky

    Acciona Energy USA Global, LLC

    Acciona Energy USA Global, LLCUnited StatesKentucky2026-07 to 2027-06 scheduleScheduled grid additions188.5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 188.5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  19. Energy organizationsOriginal document

    IPP · EIA reporting entity 67971 · Texas

    Adams Creek Solar Project, LLC

    Adams Creek Solar Project, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions240 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 240 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  20. Energy organizationsOriginal document

    IPP · EIA reporting entity 64904 · California, Illinois, North Carolina, New York, Texas

    AES Clean Energy

    AES Clean EnergyUnited StatesMultiple states2026-07 to 2027-06 scheduleScheduled grid additions344.8 MW generation · 114.4 MW storageGenerator / project developer

    9 scheduled units across 8 plants · 344.8 MW generation · 114.4 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  21. Energy organizationsOriginal document

    IPP · EIA reporting entity 61012 · Hawaii

    AES Distributed Energy

    AES Distributed EnergyUnited StatesHawaii2026-07 to 2027-06 scheduleScheduled grid additions37 MW generation · 37 MW storageGenerator / project developer

    4 scheduled units across 2 plants · 37 MW generation · 37 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  22. Energy organizationsOriginal document

    IPP · EIA reporting entity 58509 · New Mexico

    Affordable Solar Silver City, LLC

    Affordable Solar Silver City, LLCUnited StatesNew Mexico2026-07 to 2027-06 scheduleScheduled grid additions5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  23. Energy organizationsOriginal document

    Regulator / program authority · Energy research / data authority · Brazil

    Agência Nacional de Energia Elétrica

    Agência Nacional de Energia ElétricaBrazilNationalofficial authority routeGrid or large-load authority routeAuthority route · no facility MWRegulator / program authorityEnergy research / data authority

    Track generation projects, stages, fuels, outorgas, capacity, dates, and coordinates. Boundary: Generation near a campus does not prove a contract, serving connection, or actual facility draw. This profile is an official discovery route, not proof that the organization supplies a particular data center.

  24. Energy organizationsOriginal document

    IPP · EIA reporting entity 61514 · Massachusetts, West Virginia

    Agilitas Energy, Inc.

    Agilitas Energy, Inc.United StatesMultiple states2026-07 to 2027-06 scheduleScheduled grid additions18 MW generation · 9 MW storageGenerator / project developer

    7 scheduled units across 3 plants · 18 MW generation · 9 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  25. Energy organizationsOriginal document

    IPP · EIA reporting entity 67864 · Georgia

    Alligator Creek Solar, LLC

    Alligator Creek Solar, LLCUnited StatesGeorgia2026-07 to 2027-06 scheduleScheduled grid additions80 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 80 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  26. Energy organizationsOriginal document

    IPP · EIA reporting entity 60281 · New York

    Altus Power America Management, LLC

    Altus Power America Management, LLCUnited StatesNew York2026-07 to 2027-06 scheduleScheduled grid additions78 MW generationGenerator / project developer

    4 scheduled units across 4 plants · 78 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  27. Energy organizationsOriginal document

    IPP · EIA reporting entity 56101 · California

    AMERESCO Ox Mountain Energy LLC

    AMERESCO Ox Mountain Energy LLCUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions2.8 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 2.8 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  28. Energy organizationsOriginal document

    IPP · EIA reporting entity 67540 · California

    Amiscope Nordhoff, LP

    Amiscope Nordhoff, LPUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions1.9 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 1.9 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  29. Energy organizationsOriginal document

    IPP · EIA reporting entity 67298 · Texas

    Anson Solar Center 2, LLC

    Anson Solar Center 2, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions200 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 200 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  30. Energy organizationsOriginal document

    IPP · EIA reporting entity 67764 · Texas

    AP Solar 4 LLC

    AP Solar 4 LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions394.4 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 394.4 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  31. Energy organizationsOriginal document

    IPP · EIA reporting entity 67302 · Texas

    Apache Hill Energy Center

    Apache Hill Energy CenterUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions200 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 200 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  32. Energy organizationsOriginal document

    IPP · EIA reporting entity 67411 · Texas

    Apple Infra, LLC

    Apple Infra, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions9.9 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 9.9 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  33. Energy organizationsOriginal document

    IPP · EIA reporting entity 67744 · Illinois

    Argenta Solar, LLC

    Argenta Solar, LLCUnited StatesIllinois2026-07 to 2027-06 scheduleScheduled grid additions1.5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 1.5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  34. Energy organizationsOriginal document

    Electric Utility · EIA reporting entity 803 · Arizona

    Arizona Public Service Co

    Arizona Public Service CoUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions168 MW generation · 150 MW storageGenerator / project developer

    2 scheduled units across 2 plants · 168 MW generation · 150 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  35. Energy organizationsOriginal document

    Electric Utility · EIA reporting entity 807 · Arkansas

    Arkansas Electric Coop Corp

    Arkansas Electric Coop CorpUnited StatesArkansas2026-07 to 2027-06 scheduleScheduled grid additions46.5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 46.5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  36. Energy organizationsOriginal document

    Electric Utility · EIA reporting entity 924 · Oklahoma

    Associated Electric Coop, Inc

    Associated Electric Coop, IncUnited StatesOklahoma2026-07 to 2027-06 scheduleScheduled grid additions411.4 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 411.4 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  37. Energy organizationsOriginal document

    IPP · EIA reporting entity 66716 · Arizona

    ATLAS BESS IV, LLC

    ATLAS BESS IV, LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions150 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 150 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  38. Energy organizationsOriginal document

    IPP · EIA reporting entity 67217 · Arizona

    ATLAS Solar II, LLC

    ATLAS Solar II, LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions100 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 100 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  39. Energy organizationsOriginal document

    IPP · EIA reporting entity 67218 · Arizona

    ATLAS SOLAR IV, LLC

    ATLAS SOLAR IV, LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions300 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 300 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  40. Energy organizationsOriginal document

    IPP · EIA reporting entity 67968 · Arizona

    ATLAS Solar V, LLC

    ATLAS Solar V, LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions200 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 200 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  41. Energy organizationsOriginal document

    IPP · EIA reporting entity 67969 · Arizona

    ATLAS Solar VI, LLC

    ATLAS Solar VI, LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions100 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 100 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  42. Energy organizationsOriginal document

    IPP · EIA reporting entity 66718 · Arizona

    Atlas VIII LLC

    Atlas VIII LLCUnited StatesArizona2026-07 to 2027-06 scheduleScheduled grid additions382.4 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 382.4 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  43. Energy organizationsOriginal document

    Grid / market operator · Australia

    Australian Energy Market Operator

    Australian Energy Market OperatorAustraliaNational Electricity Marketofficial authority routeGrid or large-load authority routeAuthority route · no facility MWGrid / market operator

    Official NEM connection route beginning with the responsible Network Service Provider and AEMO technical process. Boundary: The NEM does not cover all Australia, and an enquiry, application, offer, agreement, energisation, and actual demand are distinct. This profile is an official discovery route, not proof that the organization supplies a particular data center.

  44. Energy organizationsOriginal document

    Regulator / program authority · Netherlands

    Authority for Consumers and Markets

    Authority for Consumers and MarketsNetherlandsCongestion areasofficial authority routeGrid or large-load authority routeAuthority route · no facility MWRegulator / program authority

    Official priority framework for transport requests in congestion areas from its operative date. Boundary: A data centre has no automatic priority solely from its sector label; each request and applicable category require evidence. This profile is an official discovery route, not proof that the organization supplies a particular data center.

  45. Energy organizationsOriginal document

    IPP · EIA reporting entity 15399 · Illinois, Oregon

    Avangrid Power LLC

    Avangrid Power LLCUnited StatesMultiple states2026-07 to 2027-06 scheduleScheduled grid additions191 MW generationGenerator / project developer

    2 scheduled units across 2 plants · 191 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  46. Energy organizationsOriginal document

    IPP · EIA reporting entity 61713 · South Carolina

    B & K Solar

    B & K SolarUnited StatesSouth Carolina2026-07 to 2027-06 scheduleScheduled grid additions74.9 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 74.9 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  47. Energy organizationsOriginal document

    IPP · EIA reporting entity 67305 · Texas

    Backbone BESS LLC

    Backbone BESS LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions121 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 121 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  48. Energy organizationsOriginal document

    IPP · EIA reporting entity 67619 · California

    Balboa Avenue I Solar Project 2023, LLC

    Balboa Avenue I Solar Project 2023, LLCUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions1.6 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 1.6 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  49. Energy organizationsOriginal document

    IPP · EIA reporting entity 67417 · New York

    Bartell South PV I LLC

    Bartell South PV I LLCUnited StatesNew York2026-07 to 2027-06 scheduleScheduled grid additions3 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 3 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  50. Energy organizationsOriginal document

    IPP · EIA reporting entity 67463 · Texas

    Barton Branch IA LLC

    Barton Branch IA LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions200 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 200 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  51. Energy organizationsOriginal document

    Utility / power supplier · Grid / market operator · Canada

    BC Hydro

    BC HydroCanadaBritish Columbiaofficial authority routeGrid or large-load authority routeAuthority route · no facility MWUtility / power supplierGrid / market operator

    Connection rules and thresholds for new data-centre or AI loads. Boundary: BC Hydro states that queue counts and megawatts are confidential. This profile is an official discovery route, not proof that the organization supplies a particular data center.

  52. Energy organizationsOriginal document

    IPP · EIA reporting entity 63793 · North Carolina

    Bear Branch Solar LLC

    Bear Branch Solar LLCUnited StatesNorth Carolina2026-07 to 2027-06 scheduleScheduled grid additions34.5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 34.5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  53. Energy organizationsOriginal document

    Electric Utility · EIA reporting entity 17612 · California

    Bear Valley Electric Service

    Bear Valley Electric ServiceUnited StatesCalifornia2026-07 to 2027-06 scheduleScheduled grid additions5 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 5 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  54. Energy organizationsOriginal document

    IPP · EIA reporting entity 67165 · Missouri

    Beavertail Solar, LLC

    Beavertail Solar, LLCUnited StatesMissouri2026-07 to 2027-06 scheduleScheduled grid additions400 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 400 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  55. Energy organizationsOriginal document

    IPP · EIA reporting entity 67538 · Louisiana

    Beekman PV I, LLC

    Beekman PV I, LLCUnited StatesLouisiana2026-07 to 2027-06 scheduleScheduled grid additions185 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 185 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  56. Energy organizationsOriginal document

    IPP · EIA reporting entity 67095 · Texas

    Bell 1 Solar, LLC

    Bell 1 Solar, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions100 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 100 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  57. Energy organizationsOriginal document

    IPP · EIA reporting entity 67096 · Texas

    Bell 1 Storage, LLC

    Bell 1 Storage, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions100 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 100 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  58. Energy organizationsOriginal document

    IPP · EIA reporting entity 66607 · Texas

    Belltown Power Texas 2, LLC

    Belltown Power Texas 2, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions126.2 MW generation · 301.8 MW storageGenerator / project developer

    3 scheduled units across 2 plants · 126.2 MW generation · 301.8 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  59. Energy organizationsOriginal document

    IPP · EIA reporting entity 61716 · South Carolina

    Big Fork Solar

    Big Fork SolarUnited StatesSouth Carolina2026-07 to 2027-06 scheduleScheduled grid additions74.9 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 74.9 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  60. Energy organizationsOriginal document

    IPP · EIA reporting entity 67560 · Illinois

    Big Muddy Solar Project, LLC

    Big Muddy Solar Project, LLCUnited StatesIllinois2026-07 to 2027-06 scheduleScheduled grid additions95 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 95 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  61. Energy organizationsOriginal document

    IPP · EIA reporting entity 67127 · Texas

    Big Sampson Wind Project, LLC

    Big Sampson Wind Project, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions265 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 265 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  62. Energy organizationsOriginal document

    IPP · EIA reporting entity 65654 · Illinois, Missouri, Texas

    Birch Creek Development

    Birch Creek DevelopmentUnited StatesMultiple states2026-07 to 2027-06 scheduleScheduled grid additions260 MW generation · 50 MW storageGenerator / project developer

    5 scheduled units across 4 plants · 260 MW generation · 50 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  63. Energy organizationsOriginal document

    Electric Utility · EIA reporting entity 19545 · South Dakota

    Black Hills Power, Inc.

    Black Hills Power, Inc.United StatesSouth Dakota2026-07 to 2027-06 scheduleScheduled grid additions97.8 MW generationGenerator / project developer

    6 scheduled units across 1 plant · 97.8 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  64. Energy organizationsOriginal document

    IPP · EIA reporting entity 67526 · Idaho

    Blacks Creek Energy Center, LLC

    Blacks Creek Energy Center, LLCUnited StatesIdaho2026-07 to 2027-06 scheduleScheduled grid additions400 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 400 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  65. Energy organizationsOriginal document

    IPP · EIA reporting entity 67102 · New York

    Bloomfield Solar, LLC

    Bloomfield Solar, LLCUnited StatesNew York2026-07 to 2027-06 scheduleScheduled grid additions5 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 5 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  66. Energy organizationsOriginal document

    IPP · EIA reporting entity 64266 · Texas

    Blue Jay Solar I, LLC

    Blue Jay Solar I, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions210 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 210 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  67. Energy organizationsOriginal document

    IPP · EIA reporting entity 66552 · Kentucky

    Blue Moon Energy LLC

    Blue Moon Energy LLCUnited StatesKentucky2026-07 to 2027-06 scheduleScheduled grid additions70 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 70 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  68. Energy organizationsOriginal document

    IPP · EIA reporting entity 67546 · Texas

    BNB Tennyson Solar LLC

    BNB Tennyson Solar LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions150 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 150 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  69. Energy organizationsOriginal document

    IPP · EIA reporting entity 67488 · Texas

    Bocanova Power II LLC

    Bocanova Power II LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions150 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 150 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  70. Energy organizationsOriginal document

    IPP · EIA reporting entity 67179 · Ohio

    Border Basin, LLC

    Border Basin, LLCUnited StatesOhio2026-07 to 2027-06 scheduleScheduled grid additions120 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 120 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  71. Energy organizationsOriginal document

    Industrial · EIA reporting entity 56953 · Indiana

    Bos Dairy, LLC

    Bos Dairy, LLCUnited StatesIndiana2026-07 to 2027-06 scheduleScheduled grid additions0.9 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 0.9 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  72. Energy organizationsOriginal document

    IPP · EIA reporting entity 66061 · Ohio

    BQ Energy Development

    BQ Energy DevelopmentUnited StatesOhio2026-07 to 2027-06 scheduleScheduled grid additions143 MW generationGenerator / project developer

    2 scheduled units across 2 plants · 143 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  73. Energy organizationsOriginal document

    IPP · EIA reporting entity 66782 · Texas

    Brazoria Solar i, LLC

    Brazoria Solar i, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions250 MW generationGenerator / project developer

    2 scheduled units across 1 plant · 250 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  74. Energy organizationsOriginal document

    IPP · EIA reporting entity 65728 · Georgia

    Brenneman Solar LLC

    Brenneman Solar LLCUnited StatesGeorgia2026-07 to 2027-06 scheduleScheduled grid additions150 MW generationGenerator / project developer

    1 scheduled unit across 1 plant · 150 MW generation. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  75. Energy organizationsOriginal document

    IPP · EIA reporting entity 67500 · Texas

    BT Amador Storage LLC

    BT Amador Storage LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions220 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 220 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  76. Energy organizationsOriginal document

    IPP · EIA reporting entity 67304 · Texas

    BT Cantwell Solar, LLC

    BT Cantwell Solar, LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions180 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 180 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  77. Energy organizationsOriginal document

    IPP · EIA reporting entity 67416 · Texas

    Buda Infra LLC

    Buda Infra LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions9.9 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 9.9 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  78. Energy organizationsOriginal document

    IPP · EIA reporting entity 67485 · New Mexico

    Buena Vista Energy Center III, LLC

    Buena Vista Energy Center III, LLCUnited StatesNew Mexico2026-07 to 2027-06 scheduleScheduled grid additions100 MW generation · 100 MW storageGenerator / project developer

    2 scheduled units across 1 plant · 100 MW generation · 100 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

  79. Energy organizationsOriginal document

    Regulator / program authority · Energy research / data authority · Germany

    Bundesnetzagentur

    BundesnetzagenturGermanyNational framework and network operatorsofficial authority routeGrid or large-load authority routeAuthority route · no facility MWRegulator / program authorityEnergy research / data authority

    Official connection framework before routing a large load to the responsible distribution or transmission operator. Boundary: The framework does not disclose a project application, offer, executed agreement, energisation, or actual draw. This profile is an official discovery route, not proof that the organization supplies a particular data center.

  80. Energy organizationsOriginal document

    IPP · EIA reporting entity 66812 · Texas

    Callisto II Energy Center LLC

    Callisto II Energy Center LLCUnited StatesTexas2026-07 to 2027-06 scheduleScheduled grid additions400 MW storageGenerator / project developer

    1 scheduled unit across 1 plant · 400 MW storage. Scheduled generator records are preliminary reporting-entity leads—not data-center supply contracts, reserved capacity, or guaranteed completion.

THE EXPANSION ORDER / S3

Global reach.
Country rules.

Twelve country playbooks now share one evidence model. Research depth still moves jurisdiction by jurisdiction so a map dot never gets mistaken for a verified project.

See the source register ↓
LIVE

Search + approval watch + 12 country rules

Facilities, organizations, builders, projects, instrument-level approval events, places, water, power, mining, sources, and twelve jurisdiction playbooks share one index and link back into the map or evidence desk.

LIVE · ENERGY

Stable energy organization pages

Canonical, source-indexable energy pages now join official IDs, aliases, exact roles, provider records, scheduled plants, project stages, and original documents. Facility, builder, and approval identities remain the next normalization lanes.

GLOBAL · IDENTITY

Operators + legal entities

Route every operator label through the responsible corporate register before asserting a legal owner, parent, parcel interest, or utility account.

GLOBAL · POWER

Large-load rules + grid records

Keep application, connection, contracted supply, scheduled generation, backup nameplate, demand scenarios, and actual draw in separate searchable classes.

GLOBAL · PROJECTS

Builders + permits

Join a builder only through the exact campus, building, or phase named by an original project, permit, procurement, owner, or contractor source.

GLOBAL · QUEUE

More countries, explicit gaps

Add adapters by official-source availability and project activity, while leaving unavailable fields visible instead of inferring them.

WHAT “AUTHORITY” MEANS / S4

Receipts before reach.

01

One thing, one ID

Facility, campus, phase, company, builder, permit, power agreement, and water record stay separate, then connect through named relationships.

02

Original first

Regulator files, utility dockets, permits, company filings, and project documents outrank a directory or press summary.

03

Numbers keep their nouns

Actual draw, design load, backup generation, onsite generation, contract capacity, water withdrawal, and consumption never collapse into one “MW” or “gallons” field.

04

History stays visible

Status, owner, builder, capacity, and source changes become dated events. A corrected fact does not erase the old claim or where it came from.

ORIGINAL-SOURCE STARTER REGISTER / S5

Where the next records come from.

These are starting points, not proof for every facility. Each project still needs a legal-entity, address, and scope match.

United Statespower

2024 United States Data Center Energy Usage Report

Lawrence Berkeley National Laboratory

National electricity-demand baseline and scenarios.

National modeling does not identify a facility meter or serving power contract.Open original ↗
United Statespower

State Electricity Profiles

U.S. Energy Information Administration

State generation, fuel, price, emissions, and electricity-system context.

In-state generation is not a facility supply mix, serving-utility proof, or meter reading.Open original ↗
United Statesenvironment

Clean Air Act resources for data centers

U.S. Environmental Protection Agency

Federal and state air-permitting framework for stationary engines and related equipment.

The framework is a routing source; each facility still requires its own issued permit or docket.Open original ↗
Canadaenvironment

Mihta Askiy Data Center Project early decision

Impact Assessment Agency of Canada

Names the proponent, project location, 650 MW generation proposal, fuel, and applicable federal and provincial authorization tracks.

An early decision is not a final collection of every permit or proof of construction.Open original ↗
Canadapower

Large Step Loads technical paper

Independent Electricity System Operator

Ontario data-center connection requests, forecast method, timing, and bulk-system context.

Prospective loads are often confidential and are not a project census.Open original ↗
Canadapower

Large data-centre and blockchain rate proposal

Hydro-Québec

Sector peak demand, 2035 outlook, project-selection threshold, and proposed rate treatment.

Sector totals and proposed rates do not disclose individual customer loads.Open original ↗
Canadapower

Emerging-industries large-load connection questions

BC Hydro

Connection rules and thresholds for new data-centre or AI loads.

BC Hydro states that queue counts and megawatts are confidential.Open original ↗
Canadaenvironment

Canadian Impact Assessment Registry

Impact Assessment Agency of Canada

Search project assessments, proponent documents, notices, geospatial files, and federal permit status.

Many projects are provincial or municipal and will not appear in the federal registry.Open original ↗
Canadawater

Permit to Take Water register and data

Government of Ontario

Permit holder, source, location, maximum daily amount, permit number, and expiry for regulated takings.

A permitted maximum is not actual use; other provinces and territories use different systems.Open original ↗
Canadafacility

Search for a Federal Corporation

Corporations Canada

Confirm federal legal names, status, registered office, and corporation identifiers.

Provincially incorporated, financial, and foreign entities require their own registries.Open original ↗
Mexicowater

Registro Público de Derechos de Agua (REPDA)

Comisión Nacional del Agua

Searchable national water-right titles, assignments, and permits.

A title must be entity- and location-matched; a nearby right is not automatically a data-center allowance.Open original ↗
Mexicopower

Conexión e Interconexión

Centro Nacional de Control de Energía

Official connection and interconnection process for power plants and load centers.

The process page is a method source; individual load-center studies may not be public.Open original ↗
Mexicopower

PRODESEN 2024–2038

Centro Nacional de Control de Energía

National grid expansion, generation, and demand-planning context.

System planning does not establish a dedicated supply relationship for a campus.Open original ↗
Mexicoenvironment

Gaceta Ecológica project and decision listings

Secretaría de Medio Ambiente y Recursos Naturales

Find projects entering federal environmental review, public consultations, and issued resolutions.

State environmental review and municipal land-use files require separate adapters.Open original ↗
Brazilwater

Cadastro Nacional de Usuários de Recursos Hídricos

Agência Nacional de Águas e Saneamento Básico

Open national register of surface-water, groundwater, discharge, and other direct water users.

Federal and state authority differ; records require legal-entity and site matching.Open original ↗
Brazilenvironment

Portal Nacional do Licenciamento Ambiental

Ministério do Meio Ambiente e Mudança do Clima

Route searches to federal, district, and state environmental licensing authorities and process summaries.

Coverage and document depth vary by licensing authority; the responsible authority must be confirmed.Open original ↗
Brazilpower

SIGA generation project open data

Agência Nacional de Energia Elétrica

Track generation projects, stages, fuels, outorgas, capacity, dates, and coordinates.

Generation near a campus does not prove a contract, serving connection, or actual facility draw.Open original ↗
Brazilfacility

Cadastro Nacional da Pessoa Jurídica

Receita Federal do Brasil

Confirm CNPJ legal name, establishment status, address, and corporate registration details.

A registered establishment is not proof that the entity owns or operates a mapped campus.Open original ↗
Chileenvironment

SEIA evaluation criteria for data-center projects

Servicio de Evaluación Ambiental

Dedicated guidance covering cooling, energy equipment, permitting triggers, impacts, emergencies, and sector permits.

The guidance explains how projects are assessed; project filings must still be collected separately.Open original ↗
Chileenvironment

e-SEIA project search

Servicio de Evaluación Ambiental

Search DIA and EIA project files by name, region, presentation date, decision date, status, and sector.

A favorable environmental decision does not replace water, grid, construction, or operating approvals.Open original ↗
Chilewater

Registered water-use rights

Dirección General de Aguas

Search original and registered water rights, transfers, approved changes, and monthly regional files.

DGA warns that registry data does not itself prove current title validity or facility use.Open original ↗
Chilepower

Open-access and grid-connection records

Coordinador Eléctrico Nacional

Review public connection requests, technical-capacity studies, credible projects, and connection-cost material.

A request or available connection point is not proof of energization, consumption, or a private contract.Open original ↗
Francefacility

Registre national des entreprises

Institut national de la propriété industrielle

Route legal-entity and establishment checks through the national business register.

A registered entity or establishment does not prove parcel ownership, campus operation, or responsibility for a utility account.Open original ↗
Francefacility

Rechercher une entreprise — Base entreprises

Institut national de la propriété industrielle

Search official company and establishment identifiers before joining project records.

Name similarity alone is not a legal-entity match and does not establish ownership or operation of a site.Open original ↗
Franceenvironment

Projets-environnement — consultation des projets

Ministère de la Transition écologique

Search environmental-participation notices and project files, then follow the competent prefectural or local authority.

A consultation or environmental filing is not planning permission, a complete permit set, or proof of construction.Open original ↗
Francewater

Banque nationale des prélèvements quantitatifs en eau

Eaufrance

Provide reported quantitative abstraction context by user, use, source, territory, and year where published.

BNPE data are not a facility water bill, current authorisation, municipal supply agreement, or proof that a nearby abstraction serves a campus.Open original ↗
Francepower

Essor des data centers en France

RTE

Official national context for data-centre electricity demand, connection activity, and system planning.

Sector outlooks and connection activity do not identify a facility meter, executed connection, or actual consumption.Open original ↗
Francemethod

Bulletin officiel des annonces des marchés publics

Direction de l’information légale et administrative

Search official public procurement notices and awards that name a project and contractor.

BOAMP does not cover every private construction contract; a supplier listing or unrelated award is not project-specific builder proof.Open original ↗
Germanyfacility

Company Register — register information

German Company Register

Resolve official legal names and obtain current, chronological, or historical register information.

A register match does not prove land ownership, facility operation, or control of a utility account.Open original ↗
Germanyenvironment

Federal Building Code (Baugesetzbuch)

Federal Ministry of Justice and Federal Office of Justice

Federal planning framework for municipal land-use and binding development plans.

The federal code is not a project approval; Länder building law and municipal files determine the site-specific route.Open original ↗
Germanyenvironment

UVP-Verbund environmental assessment portal

Federal and Länder environmental authorities

Search published environmental-assessment notices, documents, and decisions by competent authority.

Portal coverage does not replace municipal planning, building, emissions, water, or other project approvals.Open original ↗
Germanywater

Federal Water Resources Act (Wasserhaushaltsgesetz)

Federal Ministry of Justice and Federal Office of Justice

Route abstraction, groundwater, surface-water, and discharge questions to the competent water authority.

The statute is a framework; a project requires its own authorisation or municipal service evidence, and an authorised maximum is not actual use.Open original ↗
Germanypower

Grid connection

Bundesnetzagentur

Official connection framework before routing a large load to the responsible distribution or transmission operator.

The framework does not disclose a project application, offer, executed agreement, energisation, or actual draw.Open original ↗
Germanymethod

e-Vergabe public procurement platform

Procurement Office of the Federal Ministry of the Interior

Search federal public procurement notices and awards that may identify a named project contractor.

The platform does not cover every Land, municipal, or private award and cannot establish a builder without a project-specific record.Open original ↗
Germanymethod

Energy Efficiency Act (Energieeffizienzgesetz)

Federal Ministry of Justice and Federal Office of Justice

Official data-centre energy-efficiency, renewable-electricity, waste-heat, management, and reporting requirements.

Statutory scope and reporting thresholds must be checked for the relevant year; compliance data are not an operating permit or meter substitute.Open original ↗
Germanymethod

Data Centre Register (RZReg)

Bundesstelle für Energieeffizienz at BAFA

Official public route for data-centre reporting information under the Energy Efficiency Act.

Published register fields have statutory scope and confidentiality limits and do not prove ownership, permit status, contracted capacity, or actual water use.Open original ↗
United Kingdomfacility

Search the register

Companies House

Resolve company number, filings, officers, and document images before matching project parties.

Companies House warns that it does not verify filed information; registration does not prove ownership, operation, or a utility relationship.Open original ↗
United Kingdomenvironment

National Planning Policy Framework

Ministry of Housing, Communities and Local Government

National planning policy starting point before collecting the responsible local planning authority file.

Policy is not permission; an application or permission does not prove construction, commissioning, or operation.Open original ↗
United Kingdomenvironment

National Planning Framework 4

Scottish Government

Scottish planning framework before routing to the relevant planning authority and ministerial records.

The national framework does not replace the project application, decision, conditions, or building approvals.Open original ↗
United Kingdomenvironment

Planning applications

Welsh Government

Route Welsh projects to the relevant local, DNS, or significant-infrastructure planning process.

The route page is not a project decision and does not establish construction or operation.Open original ↗
United Kingdomenvironment

Northern Ireland Planning Portal

Department for Infrastructure and Northern Ireland councils

Search Northern Ireland planning applications, documents, decisions, and conditions.

Portal records cover planning stages, not every environmental, water, grid, building, or operating approval.Open original ↗
United Kingdomwater

Apply for a water abstraction or impoundment licence

Environment Agency

Route direct abstraction and impoundment authorisation in England.

A licence does not prove actual withdrawal or municipal supply, sewer, cooling, or discharge arrangements.Open original ↗
United Kingdomwater

Public Register Search

Scottish Environment Protection Agency

Search published Scottish environmental and Controlled Activities Regulations authorisations.

A register result covers the named regulated activity and is not a complete campus water or operating record.Open original ↗
United Kingdomwater

Apply for a water abstraction or impoundment licence

Natural Resources Wales

Route direct abstraction and impoundment authorisation in Wales.

A licence or application is not actual use or proof of drinking-water, sewer, cooling, or discharge service.Open original ↗
United Kingdomwater

Applying to abstract or impound water

Department of Agriculture, Environment and Rural Affairs

Route Northern Ireland abstraction and impoundment licensing questions.

The route does not establish a site authorisation, actual withdrawal, or utility connection.Open original ↗
United Kingdompower

Connections offer process

National Energy System Operator

Official Great Britain transmission-connection route and evidence stages.

An application, offer, executed agreement, contracted register entry, energisation, and actual demand are different facts.Open original ↗
United Kingdompower

Existing connections and applications

SONI

Official Northern Ireland transmission register for published connection applications and existing connections.

SONI says the register can change and excludes connections below its stated threshold; it is not an actual-demand ledger.Open original ↗
United Kingdommethod

Contracts Finder

UK Government

Search English public-sector opportunities and award notices that name a project contractor.

The service does not cover every devolved or private contract and does not prove a builder without a named project and phase.Open original ↗
United Kingdommethod

Find a Tender

UK Government

Search high-value UK public procurement notices and awards.

Procurement coverage is threshold- and sector-dependent and does not establish a privately appointed data-centre builder.Open original ↗
Irelandfacility

CRO entity search services

Companies Registration Office

Resolve exact company, limited-partnership, or business-name records and registration identifiers.

A CRO record proves registration, not parcel ownership, facility operation, or responsibility for a utility account.Open original ↗
Irelandenvironment

Local Government Online Planning portal

Local Government Management Agency

Search local planning applications and route to the responsible local authority file.

Portal discovery is not a complete approval record; an application is not permission, construction, or operation.Open original ↗
Irelandenvironment

Cases

An Coimisiún Pleanála

Search appeals, applications, referrals, hearings, and decisions handled by the national planning body.

The case route does not replace local files or separate environmental, water, grid, and building approvals.Open original ↗
Irelandenvironment

Search for a licence or permit

Environmental Protection Agency

Search regulated environmental activities, permits, and direct water-abstraction records within EPA scope.

A data centre is not automatically EPA-licensed solely by its label; the scheduled activity or plant must be identified.Open original ↗
Irelandwater

Business connection steps

Uisce Éireann

Official route for a business pre-connection enquiry and water or wastewater connection agreement.

Uisce Éireann states that planning permission does not guarantee a connection; feasibility, agreement, allowance, and actual use are distinct.Open original ↗
Irelandwater

Water and wastewater capacity registers

Uisce Éireann

Indicative water and wastewater network-capacity context for development routing.

The registers are indicative and do not replace an executed connection agreement, site allowance, trade-effluent licence, or meter record.Open original ↗
Irelandpower

New electricity connection policy for data centres

Commission for Regulation of Utilities

Current data-centre-specific policy starting point for connection assessment and associated generation and renewable requirements.

Policy conditions do not identify a project offer, executed agreement, maximum import capacity, energisation, or actual draw.Open original ↗
Irelandpower

Demand connections

EirGrid

Official process and routing for large-demand connections to EirGrid or ESB Networks.

Proposed or contracted maximum import capacity is not measured demand, and process thresholds must be checked in the current rules.Open original ↗
Irelandmethod

eTenders

Office of Government Procurement

Search Irish public procurement notices and awards that name a project and contractor.

eTenders does not cover confidential private construction awards; a builder requires project- and phase-specific evidence.Open original ↗
Irelandmethod

Data Centre Energy and Sustainability Performance Reporting Obligations

Department of Climate, Energy and the Environment

Official route for annual energy and sustainability reporting by data centres within the stated installed-IT-power scope.

A reporting record is not an operating certificate, facility census, grid agreement, or independently verified utility meter.Open original ↗
Netherlandsfacility

KVK registers: contents and use

Kamer van Koophandel

Resolve KVK number, legal form, establishment or branch, and authorised representatives.

A KVK record is not land-title, facility-operation, permit, or utility-account proof.Open original ↗
Netherlandsenvironment

Omgevingsloket

Dutch national, provincial, municipal, and water authorities

Check location rules, route permit questions, and submit applications under the Environment and Planning Act.

The portal cautions that its permit check is not legally conclusive; competent-authority decisions and local rules control.Open original ↗
Netherlandsenvironment

Milieubelastende activiteit datacentrum

Informatiepunt Leefomgeving

Official data-centre-specific environmental-rule and competent-authority routing under the Bal and local overlay.

The activity guidance is not a site permit and does not replace project-specific planning, EIA, water, emissions, or building decisions.Open original ↗
Netherlandswater

Permit requirements for surface-water abstraction activities

Informatiepunt Leefomgeving

Route surface-water abstraction to Rijkswaterstaat or the competent regional water board and its applicable rules.

The route does not prove a project permit, drinking-water supply, cooling discharge, sewer connection, or actual withdrawal.Open original ↗
Netherlandswater

Groundwater tasks and powers

Informatiepunt Leefomgeving

Route industrial groundwater abstraction by use, volume, location, province, and water-board competence.

Jurisdictional routing is not an abstraction authorisation or evidence of facility use.Open original ↗
Netherlandspower

Capaciteitskaart

Netbeheer Nederland

Indicative electricity-network capacity and congestion context before routing to the responsible operator.

Map colour or available capacity is not a connection reservation, offer, agreement, energisation, or actual demand.Open original ↗
Netherlandspower

Code decision on prioritisation space for transport requests 2025

Authority for Consumers and Markets

Official priority framework for transport requests in congestion areas from its operative date.

A data centre has no automatic priority solely from its sector label; each request and applicable category require evidence.Open original ↗
Netherlandsmethod

Dutch government online tendering system

TenderNed

Search public authority procurement notices and awards that name a project contractor.

TenderNed does not cover every private construction contract and cannot establish a builder without a named project or phase.Open original ↗
Netherlandsmethod

Officiële bekendmakingen

Dutch Government

Search formal State, municipal, provincial, and water-board notices and distinguish publication stages.

Receipt, draft decision, and final decision are different events; a notice is not a complete project evidence set.Open original ↗
Netherlandsmethod

Energy-efficiency reporting obligation for data centres

Netherlands Enterprise Agency

Official national route for annual data-centre energy and sustainability reporting within the stated installed-IT-power scope.

Operator-submitted reporting data are not permits, grid contracts, water bills, or proof of a complete facility census.Open original ↗
Australiafacility

Companies and organisations register

Australian Securities and Investments Commission

Resolve company or organisation identifiers, status, and official extracts before matching project parties.

A company record or operating brand does not prove land ownership, facility operation, or responsibility for a utility account.Open original ↗
Australiaenvironment

EPBC Act Public Portal

Australian Government environmental administration

Search Commonwealth referrals, assessment documents, decisions, and protected-matter conditions.

Commonwealth review applies only within statutory scope and does not replace state, territory, local, water, pollution, or building approvals.Open original ↗
Australiawater

Water policy

Department of Climate Change, Energy, the Environment and Water

Official routing context recognising primary state and territory responsibility for water management.

The national policy page is not a site entitlement, licence, allocation, utility agreement, bill, or consumption record.Open original ↗
Australiapower

Network connections

Australian Energy Market Operator

Official NEM connection route beginning with the responsible Network Service Provider and AEMO technical process.

The NEM does not cover all Australia, and an enquiry, application, offer, agreement, energisation, and actual demand are distinct.Open original ↗
Australiamethod

Australian Business Licence and Information Service

Australian Government

Route builder, business, planning, and operating licence questions to the applicable jurisdiction.

A licence route or registered builder does not prove appointment to a named data-centre project.Open original ↗
Australiamethod

AusTender

Australian Government Department of Finance

Search Commonwealth procurement opportunities, notices, and contract awards that name project parties.

AusTender does not cover all state, territory, local, or private construction contracts.Open original ↗
Australiamethod

Access to information guidance

Office of the Australian Information Commissioner

Official federal freedom-of-information route and publication guidance.

Federal FOI has exemptions and does not cover state or territory agencies, which use separate information-access laws.Open original ↗
Australiamethod

SOCI Act guidance for data storage and processing

Cyber and Infrastructure Security Centre

Data-centre-specific route for statutory obligations that apply to qualifying critical data-storage or processing assets.

Not every data centre is automatically a critical asset; the statutory criteria and responsible entity must be established.Open original ↗
Singaporefacility

Bizfile

Accounting and Corporate Regulatory Authority

Resolve entity name, Unique Entity Number, status, address, filings, and available business profiles.

Registration does not prove parcel ownership, facility operation, project control, or a utility-account relationship; some records require payment.Open original ↗
Singaporeenvironment

Allowable uses for Business 1 developments

Urban Redevelopment Authority

Official planning guidance stating that data farms and data centres require prior planning permission and technical-agency consultation.

The guidance is not a project planning decision, environmental clearance, building approval, or operating certificate.Open original ↗
Singaporeenvironment

Development Control

National Environment Agency

Route project plans through environmental-health, pollution, noise, industrial-siting, and clearance requirements.

Development-control guidance does not replace project-specific approvals or prove compliance, construction, or operation.Open original ↗
Singaporewater

Mandatory Water Efficiency Requirements

PUB, Singapore’s National Water Agency

Official water-efficiency and annual Water Efficiency Management Plan route for qualifying large users.

A reporting threshold or plan is not a site water bill, supply allocation, discharge approval, or proof of consumption.Open original ↗
Singaporepower

Transmission Code

Energy Market Authority

Technical requirements for connection to and operation of Singapore’s transmission system.

The code does not identify a project application, approved or contracted capacity, energisation, or actual electricity consumption.Open original ↗
Singaporepower

How to Apply for Electricity Connection

SP Group

Operational application route for electricity connections and project responsibilities.

Application, requested peak demand, connection offer, contracted capacity, and actual metered use are different facts.Open original ↗
Singaporemethod

Builders Licensing Scheme

Building and Construction Authority

Verify the applicable builder-licensing framework before checking a named contractor.

A licence or registration does not prove appointment to a particular data-centre project or phase.Open original ↗
Singaporemethod

GeBIZ

Government of Singapore

Search government procurement opportunities and awards that may name a project contractor.

GeBIZ covers public procurement and does not establish confidential private construction awards.Open original ↗
Singaporemethod

Green Data Centre Roadmap

Infocomm Media Development Authority

Official data-centre policy context for capacity growth, resource efficiency, standards, and decarbonisation.

The roadmap is policy direction, not a site allocation, planning permission, grid agreement, or operating permit.Open original ↗
Singaporemethod

Public consultation on the Digital Infrastructure Bill

Ministry of Digital Development and Information

Official consultation source for proposed resilience and environmental-sustainability obligations affecting major digital infrastructure.

This is proposed legislation and must not be described as enacted law unless an official enacted Act is located.Open original ↗
United Statesenvironment

Issued air permits for data centers

Virginia Department of Environmental Quality

Monitor named data-center air-permit decisions, issue dates, permit numbers, and localities in Virginia.

An air permit governs its stated emissions equipment and conditions; it is not a blanket project approval or proof of actual load.Open original ↗
Canadaenvironment

Beacon AI Hub planning project

Rocky View County

Track the county planning framework, land-use bylaws, hearings, decisions, and project status for Beacon AI Hub.

County planning approval does not establish a development permit, grid allocation, construction authorization, or approval for separate power generation.Open original ↗
Australiaenvironment

NSW Major Projects planning portal

NSW Department of Planning, Housing and Infrastructure

Monitor State Significant Development applications, assessment records, determination dates, consent status, conditions, and attachments.

A development consent does not prove construction commencement, grid supply, operation, or actual power use.Open original ↗
Singaporepower

Pilot Data Centre Call for Application

Infocomm Media Development Authority / Singapore Economic Development Board

Track formal data-center capacity-call requirements, selected proposals, and program-level awards.

A program allocation is not an individual planning consent, disclosed site, connection agreement, construction start, or actual draw.Open original ↗
New Zealandenvironment

Fast-track consenting project decisions

New Zealand Environmental Protection Authority

Monitor referred-project applications, panel decisions, resource-consent conditions, corrections, and appeals.

A mixed-use or resource consent proves only its stated project scope and conditions; it does not automatically prove operation.Open original ↗
Hong Kongenvironment

Planning applications and committee decisions

Hong Kong Town Planning Board

Monitor Section 16 planning applications, committee decisions, conditions, validity, and official papers.

Planning permission does not replace general building-plan approval, construction completion, operation, or a grid agreement.Open original ↗
European Unionmethod

Delegated Regulation (EU) 2024/1364

European Commission

Defines annual energy and water reporting fields for data centers with at least 500 kW installed IT demand.

Publication detail and exemptions depend on the Union database and national implementation.Open original ↗
Globalpower

Energy and AI — energy demand from AI

International Energy Agency

Global electricity-demand baseline and scenario context.

A global scenario is not a facility inventory or guaranteed project pipeline.Open original ↗