APPROVAL WATCH / A1

What changed.
What it proves.

A source-linked ledger of government approval instruments. Planning, environment, air, water, grid, building, and operating decisions stay in parallel lanes. No single permit turns into a claim that an entire project is approved.

Starter ledger checked
Aug 31, 2026
Next scheduled scan
Sep 7, 2026
Worldwide map ≠ worldwide policy monitoring.296 map units are indexed for discovery. 12 country playbooks currently provide structured policy routing across 15 map units. The remaining 281 are visible gaps—not silently treated as covered governments.
New since prior weekly check0Baseline run; backfills are separate
Official events in starter ledger138 approved with conditions
Authority routes configured95Across national and subnational lanes
Needs review / disputed0Not counted as verified approvals

OFFICIAL EVENT LEDGER / A2

13 instruments.

13 approval instruments match the current filters.

This starter ledger was assembled from original government decisions. Its first run is a baseline: older decisions found now are backfills, not approvals issued this week.

  1. Baseline / backfillApprovedAir / backup generation

    United States · Virginia · Loudoun County

    Yondr

    Issued air permit · 74265-3Stateverifiedunknown lifecycle

    Decision scopeAir permit listed by Virginia DEQ for the named Yondr data-center record.

    Authority
    Virginia Department of Environmental Quality
    Reference
    74265-3
    Decision date
    Published
    Aug 13, 2026
    First seen here
    Aug 31, 2026
    Proponent
    Yondr
    Operator label
    Yondr
    Sourced builder
    No builder named in this decision

    What this provesVirginia DEQ lists an issued air permit for the named facility and reference.

    What this does not proveIt is not a blanket project approval, grid allocation, construction certificate, or meter record.

    Show parallel approval lanes
    1. Identityprobable match
    2. SitingNo event attached
    3. EnvironmentTracked event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  2. Baseline / backfillApprovedAir / backup generation

    United States · Virginia · Culpeper County

    DataBank Culpeper

    Issued air permit · 74348-1Stateverifiedunknown lifecycle

    Decision scopeAir permit listed by Virginia DEQ for the named DataBank Culpeper data-center record.

    Authority
    Virginia Department of Environmental Quality
    Reference
    74348-1
    Decision date
    Published
    Aug 5, 2026
    First seen here
    Aug 31, 2026
    Proponent
    DataBank
    Operator label
    DataBank
    Sourced builder
    No builder named in this decision

    What this provesVirginia DEQ lists an issued air permit for the named facility and reference.

    What this does not proveIt does not prove every land-use, building, grid, water, construction, or operating approval, and it does not establish actual electricity use.

    Show parallel approval lanes
    1. Identityprobable match
    2. SitingNo event attached
    3. EnvironmentTracked event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  3. Baseline / backfillApproved with conditionsSiting / planning

    Australia · New South Wales · Guildford West

    Project Pluto Data Centre

    State Significant Development · Decision: ApprovedStateverifiedplanned lifecycle

    Decision scopeState Significant Development consent for the Project Pluto data-center proposal.

    Authority
    NSW Department of Planning, Housing and Infrastructure
    Reference
    SSD-69223466
    Decision date
    Published
    Jul 23, 2026
    First seen here
    Aug 31, 2026
    Proponent
    Goodman Property Services (Aust) Pty Ltd
    Operator label
    Not established
    Sourced builder
    No builder named in this decision

    Power facts keep their nouns

    126 MW load capacityDesign / project load · Planning application project descriptionApplication figure; not actual draw.Open power source ↗
    68 MW scheme described by Sydney WaterDesign / project load · Sydney Water service-review recordDifferent official scope; retained separately and not silently reconciled with 126 MW.Open power source ↗

    What this provesNSW records the cited State Significant Development as approved by the Director on July 23, 2026.

    What this does not proveIt does not prove construction commencement, operation, or actual power draw; two official documents use different project MW scopes.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingTracked event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  4. Baseline / backfillApproved with conditionsAir / backup generation

    Germany · Hesse · Raunheim

    Vantage Data Centers FRA32

    Industrial-emissions permit decision issuedLand / regional authorityverifiedunknown lifecycle

    Decision scopePermit decision for 20 emergency diesel engines serving data center FRA32.

    Authority
    Regierungspräsidium Darmstadt
    Reference
    FRA32 · industrial-emissions decision 2026-03-23
    Decision date
    Published
    May 5, 2026
    First seen here
    Aug 31, 2026
    Proponent
    Vantage Data Centers FRA32 GmbH
    Operator label
    Vantage Data Centers
    Sourced builder
    No builder named in this decision

    Power facts keep their nouns

    154 MW total firing thermal capacityBackup thermal input · 20 emergency diesel enginesThermal input for backup engines—not IT load, utility demand, meter draw, or electrical output.Open power source ↗

    What this provesThe authority issued the stated industrial-emissions decision for the backup-engine installation.

    What this does not proveThe 154 MW thermal-input figure is not data-center load, and the decision does not prove all building or grid approvals.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingNo event attached
    3. EnvironmentTracked event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  5. Baseline / backfillApproved with conditionsSiting / planning

    Australia · New South Wales · Marsden Park

    Marsden Park Data Centre

    State Significant Development · Decision: ApprovedStateverifiedplanned lifecycle

    Decision scopeState Significant Development consent for the Marsden Park data-center proposal.

    Authority
    NSW Department of Planning, Housing and Infrastructure
    Reference
    SSD-70889211
    Decision date
    Published
    Nov 27, 2025
    First seen here
    Aug 31, 2026
    Proponent
    CDC Data Centres Pty Ltd
    Operator label
    CDC Data Centres
    Sourced builder
    No builder named in this decision

    Power facts keep their nouns

    504 MW power consumption / IT loadDesign / project load · Project applicationProject/load figure; not actual metered draw.Open power source ↗
    720 MW substation ratingSubstation rating · Project electrical infrastructureSubstation rating; do not add to or substitute for project load.Open power source ↗

    What this provesNSW records the cited State Significant Development as approved by the Director on November 27, 2025.

    What this does not proveIt does not prove construction completion or actual draw, and the 504 MW load must remain separate from the 720 MW substation rating.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingTracked event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  6. Baseline / backfillApproved with conditionsSiting / planning

    Hong Kong · New Territories · Kwai Chung

    Kwai Chung data-centre application A/KC/510

    Section 16 application approved with conditionsTerritory planning authorityverifiedplanned lifecycle

    Decision scopePermission for minor relaxation of plot-ratio and building-height restrictions for permitted data-center use.

    Authority
    Hong Kong Town Planning Board · Metro Planning Committee
    Reference
    A/KC/510
    Decision date
    Published
    Oct 10, 2025
    First seen here
    Aug 31, 2026
    Proponent
    OXO YW Limited
    Operator label
    Not established
    Sourced builder
    No builder named in this decision

    What this provesThe planning committee approved the stated land-use parameter relaxation for data-center use.

    What this does not proveIt is not building completion, operation, or proof of a grid allocation or actual electricity demand.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingTracked event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  7. Baseline / backfillApproved with conditionsBuilding / construction

    Netherlands · Flevoland · Almere

    Dutch Cloud Campus I / Evoswitch

    Environmental and coordinated water permits grantedProvince / water boardverifiedplanned lifecycle

    Decision scopeEnvironmental permit for construction plus a coordinated water permit for surface-water withdrawal, wastewater discharge, and waterworks.

    Authority
    Gedeputeerde Staten van Flevoland / Waterschap Zuiderzeeland
    Reference
    Provinciaal Blad 2025, 10420
    Decision date
    Published
    Jun 25, 2025
    First seen here
    Aug 31, 2026
    Proponent
    Dutch Cloud Campus I B.V.
    Operator label
    Evoswitch
    Sourced builder
    No builder named in this decision

    What this provesThe named provincial and water authorities granted the stated construction/environmental and water permissions.

    What this does not proveIt does not prove secured grid capacity, construction commencement, or operation; “Evoswitch” remains the official “known as” label.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingNo event attached
    3. EnvironmentNo event attached
    4. WaterTracked event attached
    5. Power / gridNo event attached
    6. Build / operateTracked event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  8. Baseline / backfillApprovedSiting / planning

    Canada · Alberta · Rocky View County

    Beacon AI Hub

    Area Structure Plan and land-use redesignation bylaws approvedMunicipalverifiedplanned lifecycle

    Decision scopeArea Structure Plan and associated land-use redesignations for an approximately 900-acre project area.

    Authority
    Rocky View County Council
    Reference
    C-8638-2025 · C-8645-2025 · C-8648-2025
    Decision date
    Published
    Jun 17, 2025
    First seen here
    Aug 31, 2026
    Proponent
    Beacon AI Hub / Beacon
    Operator label
    Beacon
    Sourced builder
    No builder named in this decision

    What this provesThe county approved the cited planning framework and land-use redesignation bylaws.

    What this does not proveIt is not a development permit, grid allocation, construction authorization, or approval for a separately proposed power plant.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingTracked event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  9. Baseline / backfillApproved with conditionsEnvironmental

    France · Île-de-France · Dugny

    Digital Dugny data center

    Autorisation environnementale unique · arrêté préfectoral n°2025-1024Department / prefectureverifiedplanned lifecycle

    Decision scopeSingle environmental authorization including ICPE rubrique 3110 and associated environmental derogations.

    Authority
    Préfet de la Seine-Saint-Denis
    Reference
    Arrêté préfectoral n°2025-1024
    Decision date
    Published
    Mar 6, 2025
    First seen here
    Aug 31, 2026
    Proponent
    Société Digital Dugny
    Operator label
    Digital Dugny
    Sourced builder
    No builder named in this decision

    What this provesThe prefectural order grants the stated environmental authorization to the named proponent and project.

    What this does not proveIt does not prove building-permit completion, grid connection, financing, construction start, or operation.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingNo event attached
    3. EnvironmentTracked event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  10. Baseline / backfillApprovedEnvironmental

    Chile · Región Metropolitana · Huechuraba

    Ampliación Data Center Campus Scala Huechuraba

    Calificación ambiental favorable · RCA N°20251300183Regional / national systemverifiedplanned lifecycle

    Decision scopeFavorable environmental qualification of the project declaration (DIA).

    Authority
    Comisión de Evaluación de la Región Metropolitana / Servicio de Evaluación Ambiental
    Reference
    RCA N°20251300183
    Decision date
    Published
    Mar 4, 2025
    First seen here
    Aug 31, 2026
    Proponent
    SCALA Chile Data Centers SpA
    Operator label
    Scala Data Centers
    Sourced builder
    No builder named in this decision

    What this provesThe regional commission favorably qualified the named project in the environmental review lane.

    What this does not proveIt does not establish every municipal, building, utility, grid, or operating authorization.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingNo event attached
    3. EnvironmentTracked event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  11. Baseline / backfillApproved with conditionsSiting / planning

    United Kingdom · Hertfordshire · South Mimms

    DC01UK

    Outline planning permission grantedLocal planning authorityverifiedplanned lifecycle

    Decision scopeOutline planning permission for the data-center proposal described by Hertsmere Borough Council.

    Authority
    Hertsmere Borough Council Planning Committee
    Reference
    DC01UK outline permission · 2025-01-23
    Decision date
    Published
    Jan 23, 2025
    First seen here
    Aug 31, 2026
    Proponent
    DC01UK
    Operator label
    DC01UK
    Sourced builder
    No builder named in this decision

    What this provesThe local planning committee granted outline permission for the named proposal.

    What this does not proveIt leaves detailed/reserved matters and other construction, utility, grid, and operating approvals outstanding.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingTracked event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  12. Baseline / backfillApproved with conditionsSiting / planning

    New Zealand · Auckland · Silverdale / Dairy Flat

    Auckland Surf Park Community

    Resource consents granted subject to conditionsNational fast-track consenting processverifiedplanned lifecycle

    Decision scopeResource consents for a mixed-use development that includes a data center and solar farm.

    Authority
    Independent Expert Consenting Panel / New Zealand Environmental Protection Authority
    Reference
    Auckland Surf Park Community fast-track consent
    Decision date
    Published
    Jun 25, 2024
    First seen here
    Aug 31, 2026
    Proponent
    AW Holdings 2021 Limited
    Operator label
    Not established
    Sourced builder
    No builder named in this decision

    What this provesThe panel granted the stated resource consents subject to conditions for the mixed-use proposal.

    What this does not proveIt is not a standalone data-center operating approval; the data-center partner and comparable MW figure are not named in the cited record.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingTracked event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridNo event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

  13. Baseline / backfillApprovedCapacity allocation

    Singapore · National · Sites not disclosed

    Pilot Data Centre Call for Application awards

    Capacity awards finalisedNationalverifiedunknown lifecycle

    Decision scopeProgram-level selection of four proposals under the Pilot Data Centre Call for Application.

    Authority
    Singapore Economic Development Board / Infocomm Media Development Authority
    Reference
    Pilot Data Centre Call for Application
    Decision date
    Published
    Jul 14, 2023
    First seen here
    Aug 31, 2026
    Proponent
    Four selected proposals
    Operator label
    AirTrunk, ByteDance, Equinix, GDS, Microsoft
    Sourced builder
    No builder named in this decision

    Power facts keep their nouns

    Approximately 80 MW combined program allocationProgram capacity allocation · Four selected proposals combinedCombined allocation; individual proposal splits and sites were not published.Open power source ↗

    What this provesEDB and IMDA formally selected four proposals and described an approximately 80 MW combined allocation.

    What this does not proveIt is not four disclosed development consents; individual capacities, sites, planning permissions, and construction status were not published.

    Show parallel approval lanes
    1. IdentityProponent match verified
    2. SitingNo event attached
    3. EnvironmentNo event attached
    4. WaterNo event attached
    5. Power / gridTracked event attached
    6. Build / operateNo event attached

    “No event attached” means this starter ledger has no verified event in that lane. It does not mean approval was unnecessary, denied, or never issued.

WORLD POLICY COVERAGE / A3

Show the rulebook.
Show the gap.

Natural Earth map units are geography, not a count of sovereign governments. Structured approval policy currently exists only where a country playbook names the authority routes and evidence rules.

15 structured map units281 discovery-only gaps173 map units with no OSM observation
Policy depth
Map unit / sovereignPolicy depthAuthority routeDiscovery observations

REPORT BUILDER / A4

Review first.
Then report.

3 events selected. CSV, JSON, text, print, and an email-ready draft all come from the same filtered event objects. Sending remains a separate action.