CLOUDDRAW

PUBLIC RECORDS
WATER × POWER × OWNERSHIP

PUBLIC INFRASTRUCTURE, MAPPED

Where compute lands.
What it takes. Who builds it.

Edition 04U.S. + worldwide layerOriginal links kept

Start with the world, then switch to the deeper U.S. file. The map combines 4,722 U.S. records with 0 community-mapped observations in the global discovery layer. Search company, country, state or region, and local area. Water, power, owners, and builders stay separate until a source connects them.

Open the world map
0global discovery observations · open OSM layer
4,722U.S. directory plus researched High Falls project records
1,058U.S. directory records planned or under construction
1,240U.S. records in High or Extremely High stress contexts

TWO THINGS TO KNOW

A water-stress dot is not a water bill. It describes the surrounding area. It does not tell us whether a facility uses drinking water, reclaimed water, a well, a river, or closed-loop cooling.

A flag is a reason to check the record, not a verdict. Listed MW are not meter readings. Generator MW are not electricity use. Missing water data means no public figure was found—not zero use.

APPROVAL WATCH / A

Track the instrument.
Keep the scope.

Government decisions now have their own searchable event ledger. Planning permission, an air permit, a capacity award, or a water decision stays in its exact lane—never silently promoted to “the whole project is approved.”

Open Approval Watch →
Official starter events
13
Authority routes
95
Country playbooks
12
Baseline checked
2026-08-31

WHAT IS IN THE DATABASE

Worldwide reach.
Uneven depth.

The U.S. directory covers all 50 states, DC, and Puerto Rico. The global discovery layer beyond that depth file spans 0 resolved jurisdictions using openly licensed community mapping. The U.S. layer carries the deeper water, power, ownership, and pipeline research.

0jurisdictions resolved in the global discovery layer
0tagged operator labels in the global discovery layer
50U.S. states represented, plus DC and Puerto Rico
Source linkson every facility, filing, report, announcement, or investigation we cite

Database note: U.S. directory snapshot August 2026; global OSM extract loading; Cloud Draw build 2026-08-31; Cloud Draw updated 2026-08-31. One row may be a building, point, phase, project, or campus. These are source records—not a property census.

Choose map depthDiscovery map + jurisdiction rules
How each country worksOpen the rulebooks ↓

WORLD + U.S. MAP / 01

Start wide.
Then narrow down.

This combines two different source layers. Blue points are global OSM discovery observations beyond the U.S. depth file; the U.S. uses the deeper national directory and High Falls research.

0 global discovery observations matchJurisdiction, map-unit, and region labels use Natural Earth. City is an OSM locality tag when available; otherwise it is the nearest Natural Earth place within 120 km.

Open layer ready on demandOSM discovery geometry · ownership and sale status require separate evidence

Commercial evidenceDark fiber, spectrum, prices →
Current viewWorld · U.S. directory + open global layerNo search term
Map matches9across visible source layers
Global discovery0OSM observations after filters
Resolved map units0jurisdictions in current global results
Tagged operators0not legal ownership proof
Global pipeline tags0planned or construction in OSM
U.S. depth layer9water and power research stays separate
Global sourceOSMODbL · each element linked

Loading U.S. and global map layers…

global OSM discovery observation planned / construction tag U.S. water evidence closed loop / waterless U.S. high-stress context operator water-location total High Falls watershed

SELECTED RECORD

GA

Spalding Investments · High Falls Road

Georgia · Planned · Medium-High water stress

Feeds High FallsHigh Falls site; no water figure
Water useWater use unknown
CoolingClosed loop
Water sourceMunicipal Planned
Local stressMedium-High
POWER PATH2024
01 · FACILITYLoad not listedCapacity listing, not meter draw
02 · GRIDNot listedInterconnection region in the directory
03 · EVIDENCE1 related documentNot proof of this facility’s contract
Georgia in-state generation2024 · share of positive generation
Gas41%Coal13%Nuclear34%Hydro2.1%Solar6.5%Oil0.2%Biomass3.8%Other0.1%
Type
Campus
Company profile
No primary-source corporate profile yet
Operator label; ownership not proven
Listed capacity
No public figure found
Planning figure · not meter draw
Actual draw
Not public in this directory
Lifecycle
Planned
Water figure
No public figure found
No facility figure found
Water source
Municipal supply is proposed or expected; no public source mix found
Cooling
Closed loop · county required
A closed-loop water cooling system is required by the county zoning conditions; fill and makeup demand are not published
Utility
Spalding County Water Authority service area
Allowance
No published site-level EPD withdrawal cap located
Grid region
Not listed
Power source
Related public power evidence is linked above; its scope may be portfolio-wide or regional
Why it is flagged
  • Inside the watershed feeding High Falls
  • No public facility-level daily water figure found

Approximate campus location within the Upper Towaliga HUC10; not a parcel survey. The county conditions require closed-loop cooling. That is not the same as zero total water use.

GLOBAL DISCOVERY INDEX / W1

Search the open world layer.

This is the starting index beyond the U.S. depth file: 0 OpenStreetMap observations across 0 resolved jurisdictions or map units. Search it by company, jurisdiction, state or region, and city or local area. Every row links to the original OSM element.

0tagged operator labels
0planned or construction tags
0named observations

What this count means: a mapped point, building, or campus—not one verified operating company asset. Global water, power, owner, and contractor fields remain open until a source is attached.

0matching observations
Name / operatorCountry / regionAreaLifecycleSource
No global observations match.Try removing a country, region, company, or area condition.
Largest tagged operator groupsObservation counts, not verified facility portfolios

PLANET COVERAGE REGISTER / W2

Coverage register
not available.

Cloud Draw will not substitute an observed-only list under a completeness headline. The discovery rows can still load, but this register stays explicitly unavailable until the full map-unit ledger is present.

admin-0 map units checked
with source observations
visible source gaps
global playbooks active or ready

0 shown

No jurisdiction matches this coverage filter.

Zero means no matching observation in this source extract—not no data center. Admin-0 labels are geographic routing entries, not a statement that every area is universally recognized as a country.

SOURCE EXPANSION REGISTER / W3

More sources.
Kept separate.

No public database can prove that every private, sovereign, edge, leased-suite, planned, or recently changed facility is present. These lanes show what is live, what can lawfully come next, and what requires permission.

Facility discoveryLive source layer

OpenStreetMap via QLever

Mapped data-center points, buildings, campuses, and lifecycle tags with an original element link.

Community coverage is uneven; one campus can create several observations and an absent row proves nothing.
Jurisdiction registerLive coverage ledger

Natural Earth 10m admin-0 map units

Country, dependency, disputed-area, and other admin-0 labels used to make zero-source jurisdictions visible.

A geographic label is routing context, not a facility registry or a position on sovereignty.
Connectivity discoveryLive optional overlay

OpenStreetMap submarine cables and landing stations

Community-mapped undersea telecom lines and cable landing station observations with original element links.

Coverage and tags are uneven; routes are discovery geometry and do not prove title, live service, exact alignment, spare fiber, or commercial availability.
Cable approvals and legal partiesJurisdiction adapters next

Government cable licence and marine-permit adapters

Country-specific licences, assignments, landing permissions, marine permits, legal parties, conditions, and approval events.

There is no single global approvals feed; exact wet routes, stations, and security-sensitive fields may be withheld from public inspection.
Licensed global cable baselineCommercial licence required

TeleGeography geocoded submarine cable data

A stronger global cable and landing-point catalog with named systems, reported status, RFS, length, owners, suppliers, and generalized routes.

The public interactive map cannot be embedded or scraped into Cloud Draw; current raw JSON and GeoJSON require an annual commercial licence.
Dark-fiber serviceability and quotingCommercial connector required

Carrier and marketplace serviceability connectors

Route-level supplier catalogs, serviceability, rate cards, RFQs, capacity checks, and private quotes where a provider grants access.

A carrier footprint is not proof of available strands, and a private quote must remain private unless publication is explicitly authorized.
Named candidatesOpen adapter next

Wikidata data-center entities

Named facilities, coordinates, aliases, operators, dates, identifiers, and linked citations under CC0.

Sparse community-maintained secondary evidence; each candidate still needs current project or operator proof.
Legal identity routingRegistry router next

GLEIF Registration Authorities List

A machine-readable path to official business registers and validation authorities across jurisdictions.

It identifies registration paths, not data-center sites, operating status, property ownership, or utility accounts.
Independent POI candidatesScreening research

Overture Maps Places

Global place candidates with coordinates, names, source lineage, confidence, and regular releases.

The current taxonomy has no data-center category, so name-pattern candidates require review and cannot be treated as facilities.
Interconnection facilitiesPermission required

PeeringDB

Public interconnection and colocation facility records with organizations and network presence.

Not bulk-ingested: current acceptable-use terms restrict reproduction, storage, bulk transfer, mapping, and commercial use without permission.

COUNTRY PLAYBOOKS / C1

One country.
One rulebook.

The map can switch instantly. Research depth cannot. Each country gets its own route through legal identity, planning, water, power, builders, and publication checks before a discovery point becomes a verified project.

Americas 01

Canada

Federal discovery plus province-by-province water, power, assessment, registry, and local-planning adapters.

Jurisdiction shapeFederal assessment covers designated projects and federal lands; provinces and territories control most water, utility, environmental, corporate, and planning records.

Identity

Resolve the federal or provincial incorporation path before assigning a legal owner.

Accept: Corporations Canada, provincial registries, filings, and project-proponent records.
Siting

Check the federal registry, then the responsible provincial assessment system and municipality.

Accept: IAAC project files, provincial approvals, zoning, development, and building records.
Water

Route by province or territory; record licence maximums separately from reported withdrawals.

Accept: Provincial licences, Ontario PTTW, Alberta Water Act records, and municipal service files.
Power

Route by provincial utility or system operator; keep requests, allocated capacity, tariffs, and supply distinct.

Accept: IESO, Hydro-Québec, BC Hydro, provincial regulators, and utility filings.
Builders

Join a contractor only through a named project, phase, permit, or procurement document.

Accept: Owner, builder, municipal, and provincial project records.
Publish

Label the province-specific rule used and any confidential large-load field left unavailable.

Accept: Adapter version, jurisdiction, source date, matching fields, and explicit gap.

THE PLANET, IN BATCHES / C2

Expand without flattening the rules.

The open world layer remains available everywhere. Structured depth moves only after the country adapter names its authorities, identifiers, document types, update cadence, matching tests, and publication gaps.

Batch 01 · activeCanada + Mexico

Build provincial/state routers, run identity matching, and attach the first project-level water and power files.

Batch 02 · readyBrazil + Chile

Use national entry points, then branch to state, regional, municipal, water, and grid authorities.

Batch 03 · queuedColombia + Peru + Argentina + Uruguay

Document each national grid, environment, water, corporate, and local-planning system before ingest.

Batch 04 · queuedCentral America + Caribbean

Prioritize jurisdictions with public project registers and document unavailable fields instead of guessing.

Europe 01 · readyFrance + Germany + United Kingdom + Netherlands + Ireland

Apply each national and devolved adapter before attaching project-level identity, planning, water, grid, builder, or reporting records.

APAC 01 · readyAustralia + Singapore

Branch Australia by state, territory, market, and network; keep Singapore planning, utility, building, and policy evidence as separate tracks.

STATES / 02

Where the records are.

These bars count active directory rows and leave out cancellations. One campus can have several rows. Select a state to put only those records on the map.

StateActive recordsOperationalPipelineHigh-stress contextSum of listed MW2024 generation leadWater locations

COMPANIES / 03

See the whole portfolio.

Search 1,345 operator labels and map every matching row. We have completed primary-source corporate profiles for 26 large or closely watched portfolios. The rest stay marked as open research.

1,345operator labels
26researched owner profiles
0portfolios with 25+ records

An operator label is not a deed. It does not prove who owns the parcel, holds the water account, or controls every point. We leave those fields open until a primary source answers them.

Search operators across every country →

0 matching companies

Rank / companyRecordsStatesPipelineListed MWOwnershipMap

No companies match these filters.

CRYPTO-MINING LOAD / M1

Find the mines.
Keep the caveats.

This screen catches U.S. directory records tied to operators with sourced Bitcoin-mining businesses. It does not assume that every campus owned by a mixed-use company is still mining.

FEDERAL BASELINE · PUBLISHED 2024-02-01Open EIA analysis ↗

0.62.3%

EIA’s preliminary range for crypto mining as a share of U.S. electricity consumption.

137facilities EIA identified
10,275 MWmaximum use across 101 facilities
52sites EIA mapped with location + capacity
EIA called this a preliminary estimate. Maximum electricity use is not metered consumption, and the 52 mapped sites were only the facilities for which EIA published both location and capacity.
Mining-linked rows0operator-level screen; not a complete census
Listed capacity0.0 GW0/0 rows list MW · not actual draw
Operational labels0directory lifecycle, not a live meter check
Pipeline labels0planned or construction
State footprint0states with a matched operator label
Stress + water unknown0priority disclosure gaps, not abuse findings

What the purple layer means. A primary source connects the operator to Bitcoin mining. It does not prove the workload, owner, power contract, fuel, or meter draw for every directory row carrying that operator label.

Power stays labeled. Listed MW is directory capacity. The fuel shown below is the state generation leader for context—not the facility’s electricity contract. Direct, behind-the-meter, and contracted sources need their own documents.

0rows · 0 MW listed

Scroll horizontally to read every column →

Operator / evidenceDirectory rowsListed powerFootprint + state mixWater screenOriginal sourceMap

No mining-linked operator labels match these filters.

COVERAGE + COMPARISON

No one has a live, complete mine list.

EIA’s federal survey was discontinued, company portfolios keep changing, and global hashrate maps estimate geography rather than enumerate facilities. These are the methods we use and compare.

EIA U.S. crypto-mining estimate

Federal 2024 baseline. EIA identified 137 facilities, but did not publish a current complete row-level national inventory.

Open method ↗
DC Map methodology

Source of the U.S. directory rows screened here. Its listed MW may describe a building, phase, campus, or design—not actual draw.

Open method ↗
Cambridge Bitcoin Mining Map method

Country-level hashrate estimates based on mining-pool data. Useful global context, but not a facility inventory.

Open method ↗
Compute Atlas methodology

An independent, source-cited U.S. compute map that includes crypto mining under different inclusion and record-matching rules.

Open method ↗

BUILDER DESK / B1

Who is building the sites?

Construction companies are rarely named in a facility directory. This desk adds them only when a contractor, owner, or project document names the relationship. Search the builder, operator, project, state, country, or capacity.

15named builders and delivery partners
18project-specific evidence records
12outside-U.S. project records

Named does not mean exclusive. A project page may identify a general contractor or joint venture without listing every trade partner. Confidential clients stay confidential.

Search every sourced builder tie →

18 sourced projects

IndianaUnder construction

Lebanon data center campus

Meta · Lebanon, Indiana

MortensonTurner ConstructionFaith Technologies
Capacity
1 GW campus announced by Turner
Scale
About 4 million sq ft · more than $10B
Timeline
Construction announced in February 2026

Mortenson names Turner and Faith Technologies as collaborators. Turner describes itself as one of the contractors. This does not identify every trade contractor.

LouisianaUnder construction

Richland Parish data center

Meta · Richland Parish, Louisiana

DPR ConstructionTurner ConstructionMortenson
Capacity
Capacity not stated on contractor page
Scale
2,250-acre project site
Timeline
Work began in late 2024; operational target by 2030

DPR identifies a joint venture with Turner and Mortenson. The page names the project owner and construction team, but not every subcontractor.

VirginiaCompleted

M1 data center

Digital Realty · Ashburn, Virginia

DPR Construction
Capacity
6 MW phase one · 36 MW full buildout
Scale
230,000 sq ft
Timeline
Completed November 2018

DPR says Digital Realty selected it for the prototype hyperscale building. The 36 MW figure is critical power at full occupancy, not a public utility meter reading.

WashingtonCompleted

WA13

Vantage Data Centers · Quincy, Washington

DPR Construction
Capacity
64 MW IT space across five phases
Scale
550,000 sq ft · 17-acre footprint
Timeline
Final two phases turned over in fall 2025

The contractor page identifies the client and delivered IT capacity. It does not show the facility’s actual draw at a specific date.

ArizonaCompleted

Phoenix data center

Aligned Data Centers · Phoenix, Arizona

Skanska
Capacity
62 MW first phase · expandable to 120 MW
Scale
550,000 sq ft across three buildings
Timeline
Completion date not stated on the project page

Skanska identifies Aligned as the client and construction management as its service. Capacity is design context, not a meter reading.

ColoradoCompleted upgrade

B009 data center upgrade

IBM · Boulder, Colorado

Whiting-Turner
Capacity
No IT-load figure stated
Scale
100,000 sq ft
Timeline
Date not stated on the project page

The contractor page names IBM, describes live-site upgrade work, and reports removal of three 1,750 kW generators. Removed generator nameplate is not facility demand.

FinlandUnder construction

FIN02 expansion

atNorth · Espoo, Finland

Skanska
Capacity
45 MW gross capacity across the full facility
Scale
11,200 m² expansion
Timeline
Started April 2026; completion expected Q3 2027

Skanska names atNorth as its client and distinguishes the expansion scope from the 45 MW gross capacity of the whole facility.

SwitzerlandUnder construction

Zürich campus building ZRH12

Vantage Data Centers · Winterthur, Switzerland

DPR Construction
Capacity
8 MW
Scale
Three-story ground-up building
Timeline
Construction progress documented in October 2025

DPR names Vantage as the client. The 8 MW figure describes the planned building, not measured consumption.

SingaporeCompleted

Live data-center floor fit-out

Confidential colocation client · Singapore

DPR Construction
Capacity
No comparable MW stated in the cited project source
Scale
One floor in a four-story live facility
Timeline
Completion date not stated on the project page

The contractor and place are public; the customer is not. Cloud Draw leaves the owner confidential rather than attempting to infer it.

IrelandInitial phase delivered · wider work ongoing

DUB1 campus first two phases

Vantage Data Centres · Profile Park, Dublin

SiskSensori
Capacity
52 MW critical IT load · 100 MVA generation plant kept separate
Scale
22 acres · one 32 MW facility + one 20 MW facility
Timeline
Main-contractor appointment announced April 2024; current project page documents initial-phase delivery and continuing work

Sisk is the main contractor. Sensori is named for MEP, security, data, BMS, two multi-fuel generation-plant buildings, and BESS work. The 52 MW critical IT load is not the 100 MVA generation-plant capacity, actual consumption, or actual output.

IrelandCompleted

DB3 / DB4 / DB5 data-center campus

Confidential multinational client · Dublin

Sisk
Capacity
50 MW headline · 47 MW itemized across the three phases
Scale
DB3 16 MW · DB4 13 MW · DB5 18 MW
Timeline
Completed over three phases across six years; calendar dates not stated

The client remains confidential. Sisk states 50 MW total, while the phase figures on the same page add to 47 MW. Cloud Draw preserves both claims and does not reconcile the discrepancy.

United KingdomUnder construction

Docklands data-center campus first building

Ada Infrastructure · Royal Docks, London

McLaren Construction
Capacity
70 MW first building · 210 MW stated campus capacity
Scale
First of three 70 MW data-center buildings
Timeline
Shell and core due mid-2028; first-building occupation targeted by end of 2028

McLaren is contracted for the first building's shell and core, campus infrastructure, and a future district-heating interface—not the entire technical fit-out. The stated MW are planned building and campus capacity, not actual draw.

United KingdomUnder construction

LON01B2 Brent Cross

Pure Data Centres · Brent Cross, London

Glencar
Capacity
70 MW new facility · 90 MW total campus capacity
Scale
23,186 m² · 249,572 sq ft
Timeline
Expected practical completion Q2 2029

Glencar is appointed for the West Cold Shell: substructure, superstructure, envelope, and roofing. It is not presented as the full-campus or technical-fit-out contractor. Capacity is planned, not metered demand.

NetherlandsUnder construction

Amsterdam 48 MW data center

Confidential global lease provider · Amsterdam

Winthrop Technologies
Capacity
48 MW design capacity
Scale
41,500 m² · turnkey PCSA, early works, CSA, MEP, and commissioning scope
Timeline
Started December 2025; completion target not stated

The source identifies the client only as a Global Lease Provider, not a legal entity. Cloud Draw keeps it unnamed. The 48 MW is design capacity, not actual load.

GermanyCompleted · commissioning support ongoing at source capture

LEW Green Data Center

LEW TelNet · Augsburg

GOLDBECK
Capacity
1.8 MW IT capacity
Scale
More than 600 racks · 1,900 m² server area
Timeline
Built in 2024

GOLDBECK names LEW TelNet and the 1.8 MW IT capacity. Its 100% renewable-energy operating claim is not a meter reading, an actual consumption figure, or proof of a facility-specific generator.

SingaporeCompletion / operating status unresolved

Singapore data-center campus

Meta · Tanjong Kling, Singapore

Fortis Construction
Capacity
No public facility MW figure on the builder sources
Scale
About 170,000 m² · 1.8 million sq ft · S$1.4B
Timeline
Broke ground in 2018; construction topped out March 14, 2022

Fortis names Meta as the client. Current Meta materials still use once-completed language, so Cloud Draw does not infer an operating date. Renewable-project MW figures are not this facility's capacity or draw.

SingaporeOperational

Singapore Woodlands data center

Global Switch · 7 Woodlands Height, Singapore

Gammon Pte. Limited
Capacity
22 MW operator-listed facility capacity
Scale
Six stories · ten data suites
Timeline
Contract award announced May 18, 2018; current operator portfolio lists the facility

Gammon names Global Switch and the construction scope but does not state MW. The 22 MW comes from Global Switch's current portfolio and is not a meter reading or actual draw.

AustraliaCompleted

B2 data center

NEXTDC · Fortitude Valley, Queensland

FDC
Capacity
6 MW design / facility capacity
Scale
8,200 m² current page · 7,500 m² completion sheet
Timeline
Completed in 2018 after a 46-week project

FDC names NEXTDC and a 6 MW conversion. The current page lists 8,200 m² while the completion sheet lists 7,500 m²; Cloud Draw preserves both source figures. Six MW is not measured draw.

THE KNOWN QUEUE / 04

Who says they are building what.

This is the public queue, not a promise. Compare every operator label and state, then put the data-center pipeline beside the power projects and grid additions that have their own source.

Listed pipeline capacity283.0 GWcapacity is present on 561 of 1,058 rows
Construction now101.5 GWcapacity listed 189/307 rows · not metered
Planned181.5 GWcapacity listed 372/751 rows · not guaranteed
MW not listed497pipeline records
Operators with a queue350directory labels, not all legal entities
High-stress context307pipeline records; not a water-use finding
Facility water unknown1,057of 1,058 pipeline rows
New grid units scheduled84.0 GWEIA · Jul 2026Jun 2027 · generation + storage

MW needs a label. Directory MW can describe a building, phase, campus, or planned design. It is not actual draw. One campus can have several rows, phases can overlap, and missing MW is not zero.

Supply stays separate. EIA generator additions, utility plans, PPAs, onsite plants, backup generators, and load forecasts are different measures. We do not add them together.

EIA planned-unit table ↗EIA table workbook ↗EIA-860M method ↗June 2026 supporting workbook ↗Facility directory method ↗

facility rows + power documents

U.S. DEPTH · CURRENT SNAPSHOT

Growth, listed power, and the grid context beside it.

This desk makes lifecycle, listed MW, dominant state power mix, ISO/RTO region, and exact power-evidence relationships searchable. It does not turn separately sourced numbers into a facility electricity bill.

Search power classes and facilities →

DEVELOPMENT PROFILE / G1

Development stage in the current U.S. directory.

Record count and sum of listed capacity; this is a current snapshot, not a historical time series.

A row may be a building, phase, project, or campus. Listed MW is not metered demand. Rows without MW are excluded from capacity sums—not treated as zero. A dated evolution line will appear only after at least two sourced directory snapshots exist.

STATE MIRROR / G2

Data-center queue beside scheduled grid additions.

A state comparison of two separately sourced measures. The sides are not linked supply.

Directory capacity classesOperatingBuildingPlannedPausedCancelled
EIA scheduled generation + storage classesSolarWindGasNuclearHydroGeoOilCoalBiomassOtherStorage

Independent directory scale: 0–0 MWIndependent EIA schedule scale: 0–0 MW

Loading directory rows…

Directory MW is listed facility capacity. EIA MW is preliminary scheduled net-summer generating capacity or storage power capacity. EIA additions are not reserved for data centers, and the two sides should not be added or subtracted. The global discovery layer is excluded because comparable MW and power fields are not researched there.

Open the exact-value table
Filtered state graph values
StateSelected rowsListed capacityLifecycle MW breakdownMW coverageEIA generationEIA storageScheduled power breakdown2024 dominant mixMap

SEARCHABLE POWER CLASSES / G3

Keep every power relationship in its own lane.

These document classes are exact. Their MW values describe different measures, directions, and scopes, so this desk never totals them.

onsite_primesupply · facility / campus
Colossus 2 permanent onsite plant

SpaceXAI / xAI · Southaven, Mississippi

1,200 MW
Relationship
Onsite prime generation
Fuel
Combustion turbines; fuel is not stated on the cited operator update
Source scope
One operator campus; this is generation nameplate, not a public facility draw figure
Timing
Permanent plant under construction; 69 temporary mobile turbines scheduled for removal by July 2027

Named generation intended for normal onsite service. Nameplate is not facility draw.

Open source ↗
emergency_backupbackup · facility / campus
Project Raspberry emergency generator fleet

Google / Helio Capital LLC · Daleville, Botetourt County, Virginia

≈326 MW
Relationship
Emergency backup generation
Fuel
Ultra-low sulfur diesel or renewable diesel / HVO
Source scope
Three-building planned campus; about 326 MW of listed electric generator sets, excluding fire-pump engines
Timing
Minor NSR application received May 13, 2026

Emergency nameplate kept outside normal power supply.

Open source ↗
portfolio_onsitesupply · portfolio
Equinix–Bloom onsite fuel-cell portfolio

Equinix + Bloom Energy · 19 U.S. IBX data centers in six states

100+ MW
Relationship
Onsite portfolio generation
Fuel
Solid oxide fuel cells; feedstock is not specified in the cited 2025 release
Source scope
Portfolio total; not allocated to individual facility rows without site-level documents
Timing
Portfolio exceeded 100 MW in February 2025

Generation reported across a portfolio. Do not assign its total to one facility.

Open source ↗
offsite_contractcommercial · contract / portfolio
Google–Kairos advanced nuclear agreement

Google + Kairos Power · U.S. sites to be selected

Up to 500 MW
Relationship
Offsite contracted generation
Fuel
Advanced nuclear
Source scope
Grid supply agreement; not onsite generation and not assigned to one data center
Timing
First SMR targeted for 2030; additional deployments through 2035

A commercial matching or delivery arrangement, not automatically a facility fuel mix.

Open source ↗
offsite_contractcommercial · contract / portfolio
Google–TVA–Kairos Hermes 2 project

Google + TVA + Kairos Power · Oak Ridge, Tennessee / TVA grid

50 MW
Relationship
Utility-delivered contracted generation
Fuel
Advanced nuclear
Source scope
TVA-grid supply for Google data centers in Montgomery County, Tennessee, and Jackson County, Alabama
Timing
Power targeted beginning in 2030

A commercial matching or delivery arrangement, not automatically a facility fuel mix.

Open source ↗
offsite_contractcommercial · contract / portfolio
Google–Elementl early-stage nuclear sites

Google + Elementl Power · Three potential U.S. sites; locations undisclosed

1,800+ MW
Relationship
Early-stage offsite development
Fuel
Advanced nuclear
Source scope
Three potential sites at 600 MW or more each; Google has an option for commercial offtake
Timing
Elementl target: significant capacity online by 2035

A commercial matching or delivery arrangement, not automatically a facility fuel mix.

Open source ↗
offsite_contractcommercial · contract / portfolio
Crane Clean Energy Center restart

Microsoft + Constellation · Londonderry Township, Pennsylvania

835 MW
Relationship
Offsite power purchase agreement
Fuel
Nuclear
Source scope
Grid generation matched to Microsoft data-center electricity in PJM; not onsite production
Timing
20-year PPA; Constellation later accelerated restart work toward 2027

A commercial matching or delivery arrangement, not automatically a facility fuel mix.

Open source ↗
offsite_contractcommercial · contract / portfolio
Clinton Clean Energy Center PPA

Meta + Constellation · Clinton, Illinois

1,121 MW
Relationship
Offsite power purchase agreement
Fuel
Nuclear
Source scope
Plant output and clean-energy attributes; not onsite production or one facility’s draw
Timing
20-year agreement beginning June 2027; includes a 30 MW uprate

A commercial matching or delivery arrangement, not automatically a facility fuel mix.

Open source ↗
utility_plansystem supply · utility territory
Georgia Power 2028–2031 certified capacity portfolio

Georgia Power / Georgia PSC · Georgia Power retail system; includes out-of-state PPAs

9,885 MW
Relationship
Utility certified capacity resources
Fuel
Mixed portfolio: gas combined cycle / combustion turbines, batteries, solar plus batteries, and PPAs; not one fuel or generator
Source scope
Georgia Power retail and regional resource portfolio responding to large-load growth; it is not dedicated to one operator
Timing
Commercial-operation dates run from November 2027 through December 2030; certification orders issued in December 2025

System planning or procurement; not dedicated to a data center unless the source says so.

Open source ↗
regional_load_forecastload · utility / region
Dominion Virginia data-center load forecast

Dominion Energy Virginia / Virginia SCC record · Dominion Virginia service territory

1,972 → 7,239 MW
Relationship
Regional metered-load forecast
Fuel
Utility system portfolio; no dedicated facility generation assigned
Source scope
Customer-class regional load, not one campus and not generation nameplate
Timing
1,972 MW metered data-center load in 2023; 7,239 MW projected for 2035

Expected demand, not generation and not a facility meter reading.

Open source ↗

DEMAND OUTLOOK / P1

Published scenarios.
Not a crystal ball.

The global and U.S. projections below come from the IEA and Lawrence Berkeley National Laboratory. The U.S. pipeline card is our own arithmetic on directory rows with listed capacity. It is a pressure scenario—not a forecast of what will actually connect.

GLOBAL ELECTRICITY DEMANDIEA base case

415945 TWh

2024 estimate to 2030 base case · Just under 3% of global electricity in the base case.

IEA base case. It is an electricity-demand scenario, not a facility count or guaranteed outcome.Open IEA source ↗
U.S. ELECTRICITY DEMANDLBNL scenario range

176649 TWh

2023 historical to 2030 reference · 11.8% reference case; 9.5–15.3% scenario range.

The 2023 historical value is from LBNL’s 2024 report; the 2030 reference and range are from the 2025 update published in June 2026.
U.S. DIRECTORY PRESSURE SCENARIOCloud Draw arithmetic

63,006 + 282,998 MW

63,006 MW on 1,237 of 3,567 operational rows plus 282,998 MW on 561 of 1,058 planned or construction rows.

Not every row will be built; phases can overlap; listed capacity is not actual draw; rows without MW are excluded.

WATER NUMBERS / 05

Water figures with a source.

This first national layer uses Google’s reported 2024 U.S. location totals. A location may include several buildings. We do not copy the same total onto every facility row.

21.3 MGDcombined reported withdrawal16.7 MGDcombined reported consumption

POWER NUMBERS / 06

Follow the power.

Start with the facility, then move outward: listed load, any public onsite or contracted generation, the grid region, and the state’s generation mix. Each step has its own scope and source.

1,839directory records with listed MW368,042 MW summed across records; phases may overlap
Usually privatefacility actual meter drawThe national directory has no live meter field
10original-document power recordsOnsite, backup, contracted, forecast, and utility-plan evidence
51EIA state or DC generation profiles2024 generation by fuel; Puerto Rico remains unlinked
649 TWhLBNL 2030 reference case · 11.8% of U.S. electricityOpen federal-lab report ↗Search all power evidence classes →
STATE GRID CONTEXT

What generates electricity here?

Natural gaslargest share of Georgia in-state generation
140.6M MWh
Gas41%Coal13%Nuclear34%Hydro2.1%Solar6.5%Oil0.2%Biomass3.8%Other0.1%
Period2024released Nov. 10, 2025
MeasureGenerationnot retail purchases or a facility contract
Storage-765,892 MWhnet battery + pumped-storage figure, kept outside fuel shares
SOURCE ATTACHED · EIA FORMS 860, 861, 923

Do not read this bar as a facility contract. It is the state’s 2024 in-state generation mix. Imported power, a serving utility’s portfolio, a PPA, and onsite generation can all differ.

PUBLIC POWER RECORDS10 / 10
Onsite prime generationMS

Colossus 2 permanent onsite plant

SpaceXAI / xAI · Southaven, Mississippi

1,200 MW
Actual draw
No single-facility figure found
Fuel / technology
Combustion turbines; fuel is not stated on the cited operator update
Status
Under construction
What is planned
Permanent plant under construction; 69 temporary mobile turbines scheduled for removal by July 2027
Scope
One operator campus; this is generation nameplate, not a public facility draw figure

The operator says the 1.2 GW plant will use 41 permanent turbines and references a March 2026 Clean Air Act permit. This atlas does not treat that statement as a regulator-issued permit document.

Operator original disclosure · open original document ↗

FACILITY RECORDS / 07

The rows behind the dots.

Search the directory, narrow the scope, then open the original record or send a row back to the map.

9 matches Showing 9

National view · no filters
Facility / operatorLifecycle + capacityWater contextCooling + sourcingSource
No listed MWActual draw not public · Planned · Not listedNatural gas leads state mixMedium-HighNo public figure found · High Falls site; no water figureWater use unknownClosed loop · county requiredMunicipal supply is proposed or expected; no public source mix foundClosed loopOpen record ↗
No listed MWActual draw not public · Proposed / Due Diligence · Not listedNatural gas leads state mixMedium-HighNo public figure found · High Falls site; no water figureWater use unknownNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Planned · Not listedNatural gas leads state mixMedium-HighNo public figure found · High Falls site; no water figureWater use unknownNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Planned · Not listedNatural gas leads state mixMedium-High4.50 MGD · Large reported or planned demandPlanned demandNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Approved / Planned · Not listedNatural gas leads state mixMedium-High1.50 MGD · Large reported or planned demandPlanned demandNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Planned · Not listedNatural gas leads state mixMedium-High2.00 MGD · Large reported or planned demandPlanned demandNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Planned · Not listedNatural gas leads state mixMedium-HighNo public figure found · High Falls site; no water figureWater use unknownNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Planned · Not listedNatural gas leads state mixMedium-HighNo public figure found · High Falls site; no water figureWater use unknownNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗
No listed MWActual draw not public · Approved / Planned · Not listedNatural gas leads state mixMedium-HighNo public figure found · High Falls site; no water figureWater use unknownNo public cooling detailsMunicipal supply is proposed or expected; no public source mix foundCooling unknownOpen record ↗

HIGH FALLS CASE FILE / 08

Start local. Check the receipts.

Cloud Draw started with Atlanta and the Upper Towaliga watershed. These four records show the standard for the national work: name the number, name its scope, and link the document.

GOOGLE · DOUGLAS COUNTY, GEORGIA

1.21 MGD

Big draw. Mostly reclaimed.

Google reports 444.1 million gallons withdrawn in 2024. It says 98.3% was reclaimed wastewater. The site discharged 77.2 million gallons and consumed 366.9 million.

Open report ↗

META · STANTON SPRINGS, GEORGIA

106K GPD

A reported actual, not a guess.

Meta reports 146 megaliters withdrawn in 2024—about 105,700 gallons per day. The company says the site uses municipal water, not groundwater.

Open data index ↗

QTS · FAYETTEVILLE CONSTRUCTION

30.2M GAL

The meter failed. The bill came later.

County records show two connections were back-billed after their use had not been captured since July 2024. QTS said the water was used during construction and that operating cooling would be closed loop.

Open county record ↗

EDGED · ATLANTA

0 COOLING WATER

Zero for cooling. Not necessarily zero.

Edged says its Atlanta campus uses no water for cooling. The company does not publish total domestic or process water for the site.

Open company statement ↗

OTHER USEFUL MAPS / 09

Open these too.

No public project has every facility, meter, permit, power contract, and ownership record. These tools cover different parts of the picture. Cloud Draw links them here so you can compare methods and find the gaps.

01

DC Map

What it adds: Open U.S. facility locations, project status, listed capacity, grid data, risk, and water-stress screening.

What it does not prove: Its national rows do not provide a facility water bill or site power meter.

Open project ↗
02

Data Center Map

What it adds: A long-running operator and service-provider directory with a published counting method.

What it does not prove: A commercial listing still needs to be checked against permits and utility records.

Open project ↗
03

Cloudscene

What it adds: Operator rankings based on portfolio density, networks, fabrics, and cloud connections.

What it does not prove: A market ranking is not a permit, water, or meter record.

Open project ↗
04

Baxtel

What it adds: Facility inventory, development tracking, site plans, procurement, and company research.

What it does not prove: Useful market tracking. It is not a public water ledger.

Open project ↗
05

DC Byte

What it adds: Analyst-maintained coverage of self-build, hyperscale, and colocation portfolios.

What it does not prove: Much of the detail requires a subscription, and source documents are not the main product.

Open project ↗
06

datacenters.world

What it adds: A global, map-first directory with a stated methodology and API.

What it does not prove: A global location map is not a facility water or power audit.

Open project ↗
07

PNNL / DOE Data Center Atlas

What it adds: Open footprints, municipal water service areas, grid and fiber layers, and growth scenarios.

What it does not prove: Infrastructure proximity is context—not proof of a facility contract or meter.

Open project ↗
08

Baker Institute infrastructure map

What it adds: Facilities shown beside generation, transmission, fiber, prices, water stress, and public sentiment.

What it does not prove: Nearby infrastructure does not prove a facility contract or ownership relationship.

Open project ↗
09

WaterByCounty

What it adds: County screening with USGS water data, EPA discharge permits, OSM, and PNNL sources.

What it does not prove: County pressure is not a facility water audit.

Open project ↗
10

Ceres · Drained by Data

What it adds: A cumulative direct-and-electricity water-risk framework and regional case study.

What it does not prove: A pressure model cannot replace a campus meter, contract, or withdrawal permit.

Open project ↗
11

Compute Atlas

What it adds: An open, source-cited U.S. map of compute sites, capacity, friction, power projects, subsidies, and civic impacts.

What it does not prove: Its scope and inclusion rules differ from this directory, so counts should not be merged without record matching.

Open project ↗
12

OpenStreetMap data centers

What it adds: The open, community-maintained global observations used for Cloud Draw’s outside-U.S. map layer.

What it does not prove: Coverage is uneven and one campus can be represented by a site, building, point, or several of them.

Open project ↗

HOW TO READ THIS / 10

The fine print.
In plain English.

Water terms are not interchangeable. Withdrawal comes in. Discharge goes back. Consumption is the portion not returned to the same immediate system. Google’s daily figures are annual 2024 totals divided by 366.

Stress describes the area, not the facility. It does not prove local withdrawal, drinking-water use, or responsibility for a shortage.

Closed loop does not mean zero water. It describes cooling. A site can still use water for filling, makeup, domestic service, and construction.

No public figure is not zero. It means the linked record has no facility-level daily number or source mix.

A row is not always a campus. It may be a building, phase, project, or campus. The totals count records, not surveyed parcels.

Operator is not the same as owner. A company label does not prove parcel ownership, contract control, or responsibility for a utility account.

Planned means planned. Projects pause, change, and get cancelled. Check the linked record and local filing for current status.

A utility permit is not automatically a site allowance. We show an allowance only when a source ties it to the facility or clearly defines the service relationship.

MW needs a label. Listed capacity, meter draw, backup generation, onsite generation, a power contract, and a utility plan are different numbers. We do not add them together.

A state fuel mix is context, not a facility claim. EIA Table 5 shows what generated electricity inside the state in 2024. It does not identify the serving utility, imported electricity, a private PPA, or what passed through one facility meter.

“Related power document” is intentionally broad. It can mean a facility record, an operator portfolio agreement, a state utility plan, or a regional load forecast. The document card names that scope before it names the megawatts.

The global layer is a discovery index. It contains OSM observations, not a complete operating registry. Country and region labels are derived from Natural Earth; local-area labels name whether they came from an OSM tag or a nearby-place fallback.

A builder name needs a project document. Cloud Draw does not assign a contractor from proximity, reputation, or an unnamed market announcement. Joint ventures and confidential clients stay labeled as the source presents them.

Outlooks are scenarios. IEA and LBNL electricity figures describe modeled demand ranges. Cloud Draw’s pipeline arithmetic sums only directory rows with listed MW and does not assume every project connects.

The database is meant to grow. It currently combines the U.S. directory, the open global discovery layer, 23 Google water locations, 26 sourced company profiles, project-specific builder records, and the High Falls case files. New permits, utility filings, and company reports can be added without changing the basic rules.