Golden Spread Electric Cooperative, Inc

U.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity

Golden Spread Electric Cooperative, Inc: final 2024 EIA-861 utility/provider record plus 1 preliminary scheduled generating plants. Service territory and scheduled capacity do not prove data-center supply.

Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Transmission provider · Wholesale power marketer
Country / scope
United States
Published geography
Texas
Latest source release
Aug 26, 2026

Identity and evidence classes.

Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.

Cloud Draw energy ID
us-eia861:7349
EIA-861 utility ID
7349
EIA scheduled entity ID
7349
Record classes
U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Transmission provider · Wholesale power marketer
Original-source routes
3

U.S. provider census record.

EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.

Data release
2024 final data · updated Dec 3, 2025
Ownership class
Cooperative
Form depth
EIA-861 detailed frame · detailed utility activity row present
Reported activities
Buys distribution · Buys transmission · Generation · Transmission · Wholesale marketing
Operating states / territories
TX
Service-territory states
No county service-territory row
County territory rows
0 unique state-county records
NERC regions
SPP
ISO / RTO flags
ERCOT · SPP

Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.

Open EIA-861 source and files ↗

Scheduled generating projects.

June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.

Scheduled plants
1
Scheduled units
1
Plant producer classes
Electric Utility
Total net summer
201 MW
Generation
201 MW
Storage power
0 MW
Construction / complete
201 MW
Earlier stage
0 MW
Schedule window
2027-032027-03
EIA plant 58835TX

Elk Station

  • 201 MW net summer201 MW generation · 0 MW storage power
  • 201 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · ELK4
Nameplate
199.8 MW
Technology
Natural Gas Fired Combustion Turbine
Schedule
2027-032027-03

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗