CANONICAL ENERGY PROFILE SOURCE CLASSES KEPT APART
ENERGY ORGANIZATION / US-EIA861-6452
Florida Power & Light Co
U.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity
Florida Power & Light Co: final 2024 EIA-861 utility/provider record plus 5 preliminary scheduled generating plants. Service territory and scheduled capacity do not prove data-center supply.
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider · Wholesale power marketer
Country / scope
United States
Published geography
Florida
Latest source release
Aug 26, 2026
Identity and evidence classes.
Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.
Cloud Draw energy ID
us-eia861:6452
EIA-861 utility ID
6452
EIA scheduled entity ID
6452
Record classes
U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider · Wholesale power marketer
Original-source routes
3
U.S. provider census record.
EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.
Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.
June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.
Scheduled plants
5
Scheduled units
5
Plant producer classes
Electric Utility
Total net summer
372.5 MW
Generation
372.5 MW
Storage power
0 MW
Construction / complete
372.5 MW
Earlier stage
0 MW
Schedule window
2027-01 → 2027-04
EIA plant 68829FL
Ambersweet
74.5 MW net summer74.5 MW generation · 0 MW storage power
74.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · 1
Nameplate
74.5 MW
Technology
Solar Photovoltaic
Schedule
2027-04 → 2027-04
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.