CANONICAL ENERGY PROFILE
SOURCE CLASSES KEPT APART

ENERGY ORGANIZATION / US-EIA861-57313

Tesla Inc.

U.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity

Tesla Inc.: final 2024 EIA-861 utility/provider record plus 4 preliminary scheduled generating plants. Service territory and scheduled capacity do not prove data-center supply.

Source-established role / class
Generator / project developer · EIA-861 respondent record
Country / scope
United States
Published geography
California · Maryland · Nevada · Texas
Latest source release
Aug 26, 2026

Identity and evidence classes.

Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.

Cloud Draw energy ID
us-eia861:57313
EIA-861 utility ID
57313
EIA scheduled entity ID
57313
Record classes
U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · EIA-861 respondent record
Original-source routes
3

U.S. provider census record.

EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.

Data release
2024 final data · updated Dec 3, 2025
Ownership class
Behind the Meter
Form depth
EIA-861 detailed frame · detailed utility activity row present
Reported activities
Generation
Operating states / territories
CA
Service-territory states
No county service-territory row
County territory rows
0 unique state-county records
NERC regions
Not stated
ISO / RTO flags
CAISO · ERCOT · ISONE · MISO · NYISO · PJM · SPP

Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.

Open EIA-861 source and files ↗

Scheduled generating projects.

June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.

Scheduled plants
4
Scheduled units
7
Plant producer classes
IPP · Industrial
Total net summer
9.1 MW
Generation
9.1 MW
Storage power
0 MW
Construction / complete
9.1 MW
Earlier stage
0 MW
Schedule window
2026-092026-09
EIA plant 65072CA

Fremont CA AutoFactory

  • 3.8 MW net summer3.8 MW generation · 0 MW storage power
  • 3.8 MW construction / complete0 MW earlier stage · overlapping status axis
Units
4 · GA3, GVSRS, STAMP, VSRS
Nameplate
3.8 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(TS) Construction complete, but not yet in commercial operation · (U) Under construction, less than or equal to 50 percent complete · (V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 65070TX

Austin TX GigaFactory

  • 2.3 MW net summer2.3 MW generation · 0 MW storage power
  • 2.3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · A04
Nameplate
2.3 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(TS) Construction complete, but not yet in commercial operation

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 65130MD

City of Bowie

  • 2 MW net summer2 MW generation · 0 MW storage power
  • 2 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · PV2
Nameplate
2 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 64098NV

Tesla Reno GigaFactory

  • 1 MW net summer1 MW generation · 0 MW storage power
  • 1 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · 3
Nameplate
1 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(TS) Construction complete, but not yet in commercial operation

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.