ENERGY ORGANIZATION / US-EIA861-55937

Entergy Texas Inc.

U.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity

Entergy Texas Inc.: final 2024 EIA-861 utility/provider record plus 1 preliminary scheduled generating plants. Service territory and scheduled capacity do not prove data-center supply.

Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider
Country / scope
United States
Published geography
Texas
Latest source release
Aug 26, 2026

Identity and evidence classes.

Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.

Cloud Draw energy ID
us-eia861:55937
EIA-861 utility ID
55937
EIA scheduled entity ID
55937
Record classes
U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider
Original-source routes
3

U.S. provider census record.

EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.

Data release
2024 final data · updated Dec 3, 2025
Ownership class
Investor Owned
Form depth
EIA-861 detailed frame · detailed utility activity row present
Reported activities
Buys distribution · Buys transmission · Distribution · Generation · Transmission
Operating states / territories
TX
Service-territory states
TX
County territory rows
27 unique state-county records
NERC regions
SERC
ISO / RTO flags
MISO

Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.

Open EIA-861 source and files ↗

Scheduled generating projects.

June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.

Scheduled plants
1
Scheduled units
3
Plant producer classes
Electric Utility
Total net summer
1,158.2 MW
Generation
1,158.2 MW
Storage power
0 MW
Construction / complete
1,158.2 MW
Earlier stage
0 MW
Schedule window
2026-082026-08
EIA plant 66621TX

Orange County Advanced Power Station

  • 1,158.2 MW net summer1,158.2 MW generation · 0 MW storage power
  • 1,158.2 MW construction / complete0 MW earlier stage · overlapping status axis
Units
3 · 1A, 1B, 1C
Nameplate
1,306 MW
Technology
Natural Gas Fired Combined Cycle
Schedule
2026-082026-08

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗