CANONICAL ENERGY PROFILE SOURCE CLASSES KEPT APART
ENERGY ORGANIZATION / US-EIA861-14600
Payson City Corporation
U.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity
Payson City Corporation: final 2024 EIA-861 utility/provider record plus 1 preliminary scheduled generating plants. Service territory and scheduled capacity do not prove data-center supply.
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record
Country / scope
United States
Published geography
Utah
Latest source release
Aug 26, 2026
Identity and evidence classes.
Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.
Cloud Draw energy ID
us-eia861:14600
EIA-861 utility ID
14600
EIA scheduled entity ID
14600
Record classes
U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record
Original-source routes
3
U.S. provider census record.
EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.
Data release
2024 final data · updated Dec 3, 2025
Ownership class
Municipal
Form depth
EIA-861S short form · no detailed Utility Data row
Reported activities
Not published in detailed Utility Data
Operating states / territories
No detailed operating-state row
Service-territory states
UT
County territory rows
1 unique state-county records
NERC regions
Not stated
ISO / RTO flags
No flagged region
Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.
June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.
Scheduled plants
1
Scheduled units
6
Plant producer classes
Electric Utility
Total net summer
12.6 MW
Generation
12.6 MW
Storage power
0 MW
Construction / complete
12.6 MW
Earlier stage
0 MW
Schedule window
2026-08 → 2026-08
EIA plant 7408UT
Payson
12.6 MW net summer12.6 MW generation · 0 MW storage power
12.6 MW construction / complete0 MW earlier stage · overlapping status axis
Units
6 · 86-3C, 86-4C, 86-5C, 86-6C, 86-7C, 86-8C
Nameplate
14.4 MW
Technology
Natural Gas Internal Combustion Engine
Schedule
2026-08 → 2026-08
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.