CANONICAL ENERGY PROFILE SOURCE CLASSES KEPT APART
ENERGY ORGANIZATION / US-EIA861-12698
Evergy Missouri West
U.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity
Evergy Missouri West: final 2024 EIA-861 utility/provider record plus 2 preliminary scheduled generating plants. Service territory and scheduled capacity do not prove data-center supply.
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider · Wholesale power marketer
Country / scope
United States
Published geography
Kansas · Missouri
Latest source release
Aug 26, 2026
Identity and evidence classes.
Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.
Cloud Draw energy ID
us-eia861:12698
EIA-861 utility ID
12698
EIA scheduled entity ID
12698
Record classes
U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider · Wholesale power marketer
Original-source routes
3
U.S. provider census record.
EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.
Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.
June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.
Scheduled plants
2
Scheduled units
2
Plant producer classes
Electric Utility
Total net summer
172 MW
Generation
172 MW
Storage power
0 MW
Construction / complete
172 MW
Earlier stage
0 MW
Schedule window
2027-04 → 2027-05
EIA plant 69481MO
Foxtrot Solar Energy LLC
107 MW net summer107 MW generation · 0 MW storage power
107 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · FXTRT
Nameplate
107 MW
Technology
Solar Photovoltaic
Schedule
2027-04 → 2027-04
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.