EIA plant 70012CA
Redlands DC 9 - sline609
- 5 MW net summer2.6 MW generation · 2.4 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 2 · BA609, IN609
- Nameplate
- 5 MW
- Technology
- Batteries · Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68140IL
Melrose Park 2-SLCHI547
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH547
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68144IL
Northlake 5-SLCHI305
- 2.5 MW net summer2.5 MW generation · 0 MW storage power
- 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH305
- Nameplate
- 2.5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68139IL
McCook 2-SLCHI102
- 2 MW net summer2 MW generation · 0 MW storage power
- 2 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH102
- Nameplate
- 2 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68119IL
Aurora 7-SLCHI307
- 1.9 MW net summer1.9 MW generation · 0 MW storage power
- 1.9 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH307
- Nameplate
- 1.9 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-04 → 2027-04
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68122IL
Bensenville 2-SLCHI526
- 1.9 MW net summer1.9 MW generation · 0 MW storage power
- 1.9 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH526
- Nameplate
- 1.9 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68129IL
Cicero 3-SLCHI603
- 1.9 MW net summer1.9 MW generation · 0 MW storage power
- 1.9 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH603
- Nameplate
- 1.9 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-04 → 2027-04
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68138IL
Internationale Ctr 11-SLCHI321
- 1.8 MW net summer1.8 MW generation · 0 MW storage power
- 1.8 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH321
- Nameplate
- 1.8 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68127IL
Bensenville Ind Park 4-SLCHI424
- 1.7 MW net summer1.7 MW generation · 0 MW storage power
- 1.7 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH424
- Nameplate
- 1.7 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68132IL
Elk Grove 1-SLCHI701
- 1.7 MW net summer1.7 MW generation · 0 MW storage power
- 1.7 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH701
- Nameplate
- 1.7 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68118IL
Addison 11-SLCHI404
- 1.6 MW net summer1.6 MW generation · 0 MW storage power
- 1.6 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH404
- Nameplate
- 1.6 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68130IL
Des Plaines 11-SLCHI211
- 1.6 MW net summer1.6 MW generation · 0 MW storage power
- 1.6 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH211
- Nameplate
- 1.6 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68141IL
Northlake 2-SLCHI302
- 1.6 MW net summer1.6 MW generation · 0 MW storage power
- 1.6 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH302
- Nameplate
- 1.6 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-11 → 2026-11
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68142IL
Northlake 3-SLCHI303
- 1.6 MW net summer1.6 MW generation · 0 MW storage power
- 1.6 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH303
- Nameplate
- 1.6 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70095CA
Perris DC 5 - sline015
- 1.6 MW net summer1.6 MW generation · 0 MW storage power
- 1.6 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · IN015
- Nameplate
- 1.6 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68120IL
Bensenville 13-SLCHI513
- 1.4 MW net summer1.4 MW generation · 0 MW storage power
- 1.4 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH513
- Nameplate
- 1.4 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68133IL
Elk Grove 51-SLCHI151
- 1.4 MW net summer1.4 MW generation · 0 MW storage power
- 1.4 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH151
- Nameplate
- 1.4 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-02 → 2027-02
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68143IL
Northlake 4-SLCHI304
- 1.4 MW net summer1.4 MW generation · 0 MW storage power
- 1.4 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH304
- Nameplate
- 1.4 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69891CA
Torrance Dis Ctr 2 - SLLAX100
- 1.4 MW net summer1.4 MW generation · 0 MW storage power
- 1.4 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA100
- Nameplate
- 1.4 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68793CA
Bandini - SLLAX710
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA710
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68121IL
Bensenville 14-SLCHI414
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH414
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-04 → 2027-04
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68790CA
Dominguez - SLLAX512
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA512
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68792CA
Fordyce - SLLAX680
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA680
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68137IL
Glendale Heights 10-SLCHI910
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH910
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-02 → 2027-02
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68237CA
South Bay Dis Ctr 20-SLLAX512
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA512
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68236CA
South Bay Dis Ctr 6-SLLAX680
- 1.3 MW net summer1.3 MW generation · 0 MW storage power
- 1.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA680
- Nameplate
- 1.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68123IL
Bensenville Ind Park 10-SLCHI410
- 1.2 MW net summer1.2 MW generation · 0 MW storage power
- 1.2 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH410
- Nameplate
- 1.2 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-01 → 2027-01
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68124IL
Bensenville Ind Park 11
- 1.2 MW net summer1.2 MW generation · 0 MW storage power
- 1.2 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH411
- Nameplate
- 1.2 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68238CA
Commerce Distribution Center 4-SLLAX113
- 1.2 MW net summer1.2 MW generation · 0 MW storage power
- 1.2 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA113
- Nameplate
- 1.2 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68135IL
Franklin Park 2-SLCHI802
- 1.2 MW net summer1.2 MW generation · 0 MW storage power
- 1.2 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH802
- Nameplate
- 1.2 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68789CA
South Bay Dis Ctr 12 - SLLAX104
- 1.2 MW net summer1.2 MW generation · 0 MW storage power
- 1.2 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · LA104
- Nameplate
- 1.2 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68126IL
Bensenville Ind Park 2-SLCHI402
- 1.1 MW net summer1.1 MW generation · 0 MW storage power
- 1.1 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CH402
- Nameplate
- 1.1 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69609CA
San Leandro 10 - sleba702
- 1 MW net summer1 MW generation · 0 MW storage power
- 1 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · EB702
- Nameplate
- 1 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-01 → 2027-01
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69786CA
Stockton 9 - slcva209
- 1 MW net summer1 MW generation · 0 MW storage power
- 1 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CV209
- Nameplate
- 1 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 68235IL
Romeoville 34 - SLCHI234 - BSCHI234
- 0.5 MW net summer0 MW generation · 0.5 MW storage power
- 0.5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · C34BB
- Nameplate
- 0.5 MW
- Technology
- Batteries
- Schedule
- 2027-05 → 2027-05
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗