Dimension Energy LLC

U.S. EIA scheduled generating entity

Dimension Energy LLC: 37 plants and 145.9 MW in EIA's preliminary 2026-07–2027-06 scheduled-additions window. This is not actual production or a data-center contract.

Source-established role / class
Generator / project developer
Country / scope
United States
Published geography
Illinois · New Jersey · New York · Pennsylvania · Virginia
EIA schedule release
Aug 26, 2026

Identity and evidence classes.

Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.

Cloud Draw energy ID
us-eia860m:65677
EIA scheduled entity ID
65677
Record classes
U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer
Original-source routes
2

Scheduled generating projects.

June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.

Scheduled plants
37
Scheduled units
37
Plant producer classes
IPP
Total net summer
145.9 MW
Generation
145.9 MW
Storage power
0 MW
Construction / complete
131.5 MW
Earlier stage
14.4 MW
Schedule window
2026-072027-06
EIA plant 69841IL

Bluestar Solar Project, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · BLUST
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70025IL

Cincinnati CSG 1 LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · CINC1
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-102026-10

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70026IL

Cincinnati CSG 2 LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · CINC2
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-102026-10

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70027NY

Cortland CSG 2 LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · CORT2
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-102026-10

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70030NY

Fabius CSG LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · FABIU
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-112026-11

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69837IL

Falconhead Solar, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · FALCH
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-102026-10

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69997IL

Fast Ave Solar LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · FASTA
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69846IL

Gerstenschlager Family Solar 1, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · GRST1
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-072026-07

(TS) Construction complete, but not yet in commercial operation

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70001IL

Harper Creek Solar, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · HARPC
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69844IL

Horseshoe Solar Project, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · HORSE
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 67639NY

Leatherleaf

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 0 MW construction / complete5 MW earlier stage · overlapping status axis
Units
1 · LLEAF
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2027-022027-02

(L) Regulatory approvals pending. Not under construction

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70002NY

Macedon CSG LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · MACED
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69852IL

McCray Solar 1, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · MCCR1
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69838IL

Paris Solar, LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · PARIS
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-072026-07

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70007VA

Richmond Road Solar LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 0 MW construction / complete5 MW earlier stage · overlapping status axis
Units
1 · RICHR
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2027-062027-06

(T) Regulatory approvals received. Not under construction

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69848IL

Spillertown CSG 1 LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · SPIL1
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69847IL

Spillertown CSG 2 LLC

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · SPIL2
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70009IL

Willis Solar 1, LLC - (IL)

  • 5 MW net summer5 MW generation · 0 MW storage power
  • 5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · WILL1
Nameplate
5 MW
Technology
Solar Photovoltaic
Schedule
2027-012027-01

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69828NY

Mexico PV, LLC

  • 4.5 MW net summer4.5 MW generation · 0 MW storage power
  • 4.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · MEXIC
Nameplate
4.5 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69834NY

Avon CSG 2 LLC

  • 4.1 MW net summer4.1 MW generation · 0 MW storage power
  • 4.1 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · AVON2
Nameplate
4.1 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(TS) Construction complete, but not yet in commercial operation

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69854NY

TJA-NY-1806 Perth Rd Galway, LLC

  • 3.3 MW net summer3.3 MW generation · 0 MW storage power
  • 3.3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · GLWAY
Nameplate
3.3 MW
Technology
Solar Photovoltaic
Schedule
2026-092026-09

(TS) Construction complete, but not yet in commercial operation

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69842NJ

Carneys Point Solar 1 LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · CARN1
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69998PA

Franklin White Church Road Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · WHTCH
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2027-032027-03

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69999PA

Greenwood Bottom Road Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · GREEB
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2027-032027-03

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70000PA

Greenwood Route 254 Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · GREER
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2027-032027-03

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70003PA

Madison Taylor Road Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · TAYLR
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2027-032027-03

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70004PA

Monroe Route 35 Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · MONRO
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69996PA

Penn Hemlock Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · HEMLK
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70005PA

Penn Shoofly Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 0 MW construction / complete3 MW earlier stage · overlapping status axis
Units
1 · SHOOF
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2027-052027-05

(T) Regulatory approvals received. Not under construction

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70006PA

Perry Route 104 Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · PERRR
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69855NY

Pomfret PV, LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · POMFR
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2026-082026-08

(TS) Construction complete, but not yet in commercial operation

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70008PA

West Perry Planing Mill Road Solar LLC

  • 3 MW net summer3 MW generation · 0 MW storage power
  • 3 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · WPERR
Nameplate
3 MW
Technology
Solar Photovoltaic
Schedule
2027-022027-02

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69840IL

CVE US IL Ridge Farm 324 LLC

  • 2.5 MW net summer2.5 MW generation · 0 MW storage power
  • 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · RIDGF
Nameplate
2.5 MW
Technology
Solar Photovoltaic
Schedule
2026-072026-07

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69835NJ

Starke Solar LLC

  • 2.5 MW net summer2.5 MW generation · 0 MW storage power
  • 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · STARK
Nameplate
2.5 MW
Technology
Solar Photovoltaic
Schedule
2026-072026-07

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70031IL

Zebrawood Solar, LLC

  • 2.5 MW net summer2.5 MW generation · 0 MW storage power
  • 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · ZEBRA
Nameplate
2.5 MW
Technology
Solar Photovoltaic
Schedule
2026-102026-10

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 69833NJ

Bayonne Solar 2 LLC

  • 2.1 MW net summer2.1 MW generation · 0 MW storage power
  • 2.1 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · BAYO2
Nameplate
2.1 MW
Technology
Solar Photovoltaic
Schedule
2026-072026-07

(V) Under construction, more than 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 70029NJ

East Windsor Solar 1 LLC

  • 1.4 MW net summer1.4 MW generation · 0 MW storage power
  • 0 MW construction / complete1.4 MW earlier stage · overlapping status axis
Units
1 · EWIN1
Nameplate
1.4 MW
Technology
Solar Photovoltaic
Schedule
2027-032027-03

(T) Regulatory approvals received. Not under construction

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗