EIA plant 69841IL
Bluestar Solar Project, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · BLUST
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70025IL
Cincinnati CSG 1 LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CINC1
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70026IL
Cincinnati CSG 2 LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CINC2
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70027NY
Cortland CSG 2 LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CORT2
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70030NY
Fabius CSG LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · FABIU
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-11 → 2026-11
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69837IL
Falconhead Solar, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · FALCH
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69997IL
Fast Ave Solar LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · FASTA
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69846IL
Gerstenschlager Family Solar 1, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · GRST1
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70001IL
Harper Creek Solar, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · HARPC
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69844IL
Horseshoe Solar Project, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · HORSE
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 67639NY
Leatherleaf
- 5 MW net summer5 MW generation · 0 MW storage power
- 0 MW construction / complete5 MW earlier stage · overlapping status axis
- Units
- 1 · LLEAF
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-02 → 2027-02
(L) Regulatory approvals pending. Not under construction
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70002NY
Macedon CSG LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · MACED
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69852IL
McCray Solar 1, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · MCCR1
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69838IL
Paris Solar, LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · PARIS
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70007VA
Richmond Road Solar LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 0 MW construction / complete5 MW earlier stage · overlapping status axis
- Units
- 1 · RICHR
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-06 → 2027-06
(T) Regulatory approvals received. Not under construction
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69848IL
Spillertown CSG 1 LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · SPIL1
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69847IL
Spillertown CSG 2 LLC
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · SPIL2
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70009IL
Willis Solar 1, LLC - (IL)
- 5 MW net summer5 MW generation · 0 MW storage power
- 5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · WILL1
- Nameplate
- 5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-01 → 2027-01
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69828NY
Mexico PV, LLC
- 4.5 MW net summer4.5 MW generation · 0 MW storage power
- 4.5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · MEXIC
- Nameplate
- 4.5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69834NY
Avon CSG 2 LLC
- 4.1 MW net summer4.1 MW generation · 0 MW storage power
- 4.1 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · AVON2
- Nameplate
- 4.1 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69854NY
TJA-NY-1806 Perth Rd Galway, LLC
- 3.3 MW net summer3.3 MW generation · 0 MW storage power
- 3.3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · GLWAY
- Nameplate
- 3.3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-09 → 2026-09
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69842NJ
Carneys Point Solar 1 LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · CARN1
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69998PA
Franklin White Church Road Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · WHTCH
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69999PA
Greenwood Bottom Road Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · GREEB
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70000PA
Greenwood Route 254 Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · GREER
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70003PA
Madison Taylor Road Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · TAYLR
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70004PA
Monroe Route 35 Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · MONRO
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69996PA
Penn Hemlock Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · HEMLK
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70005PA
Penn Shoofly Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 0 MW construction / complete3 MW earlier stage · overlapping status axis
- Units
- 1 · SHOOF
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-05 → 2027-05
(T) Regulatory approvals received. Not under construction
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70006PA
Perry Route 104 Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · PERRR
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69855NY
Pomfret PV, LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · POMFR
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-08 → 2026-08
(TS) Construction complete, but not yet in commercial operation
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70008PA
West Perry Planing Mill Road Solar LLC
- 3 MW net summer3 MW generation · 0 MW storage power
- 3 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · WPERR
- Nameplate
- 3 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-02 → 2027-02
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69840IL
CVE US IL Ridge Farm 324 LLC
- 2.5 MW net summer2.5 MW generation · 0 MW storage power
- 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · RIDGF
- Nameplate
- 2.5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69835NJ
Starke Solar LLC
- 2.5 MW net summer2.5 MW generation · 0 MW storage power
- 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · STARK
- Nameplate
- 2.5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70031IL
Zebrawood Solar, LLC
- 2.5 MW net summer2.5 MW generation · 0 MW storage power
- 2.5 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · ZEBRA
- Nameplate
- 2.5 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-10 → 2026-10
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 69833NJ
Bayonne Solar 2 LLC
- 2.1 MW net summer2.1 MW generation · 0 MW storage power
- 2.1 MW construction / complete0 MW earlier stage · overlapping status axis
- Units
- 1 · BAYO2
- Nameplate
- 2.1 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2026-07 → 2026-07
(V) Under construction, more than 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗EIA plant 70029NJ
East Windsor Solar 1 LLC
- 1.4 MW net summer1.4 MW generation · 0 MW storage power
- 0 MW construction / complete1.4 MW earlier stage · overlapping status axis
- Units
- 1 · EWIN1
- Nameplate
- 1.4 MW
- Technology
- Solar Photovoltaic
- Schedule
- 2027-03 → 2027-03
(T) Regulatory approvals received. Not under construction
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.
EIA Table 6.5 workbook ↗