Tennessee Valley Authority: source-linked data-center energy relationships, projects, capacity stages, roles, and original documents in Cloud Draw.
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Transmission provider · Utility / power supplier · Grid / market operator
Country / scope
United States
Published geography
Georgia · Kentucky · North Carolina · Tennessee · Tennessee Valley
Evidence checked
Aug 30, 2026
Identity and evidence classes.
Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.
Cloud Draw energy ID
curated:tennessee-valley-authority
EIA-861 utility ID
18642
EIA scheduled entity ID
18642
Record classes
Source-linked data-center relationship · U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Transmission provider · Utility / power supplier · Grid / market operator
Original-source routes
4
U.S. provider census record.
EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.
Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.
Operating, construction, contracted, approved, framework, forecast, and manufacturing figures stay separate. Parent totals and included projects are marked so they are never counted twice.
June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.
Scheduled plants
2
Scheduled units
3
Plant producer classes
Electric Utility
Total net summer
689.5 MW
Generation
669.5 MW
Storage power
20 MW
Construction / complete
689.5 MW
Earlier stage
0 MW
Schedule window
2026-12 → 2026-12
EIA plant 3399TN
Cumberland (TN)
669.5 MW net summer669.5 MW generation · 0 MW storage power
669.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
2 · CTG1, STG1
Nameplate
777.8 MW
Technology
Natural Gas Fired Combined Cycle
Schedule
2026-12 → 2026-12
(U) Under construction, less than or equal to 50 percent complete
Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.