Tennessee Valley Authority

Also indexed as TVA

Source-linked data-center relationshipU.S. EIA-861 2024 census respondentU.S. EIA scheduled generating entity

Tennessee Valley Authority: source-linked data-center energy relationships, projects, capacity stages, roles, and original documents in Cloud Draw.

Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Transmission provider · Utility / power supplier · Grid / market operator
Country / scope
United States
Published geography
Georgia · Kentucky · North Carolina · Tennessee · Tennessee Valley
Evidence checked
Aug 30, 2026

Identity and evidence classes.

Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.

Cloud Draw energy ID
curated:tennessee-valley-authority
EIA-861 utility ID
18642
EIA scheduled entity ID
18642
Record classes
Source-linked data-center relationship · U.S. EIA-861 2024 census respondent · U.S. EIA scheduled generating entity
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Transmission provider · Utility / power supplier · Grid / market operator
Original-source routes
4

U.S. provider census record.

EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.

Data release
2024 final data · updated Dec 3, 2025
Ownership class
Federal
Form depth
EIA-861 detailed frame · detailed utility activity row present
Reported activities
Generation · Transmission
Operating states / territories
TN
Service-territory states
GA · KY · NC
County territory rows
3 unique state-county records
NERC regions
Not stated
ISO / RTO flags
No flagged region

Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.

Open EIA-861 source and files ↗

Data-center relationships and capacity facts.

Operating, construction, contracted, approved, framework, forecast, and manufacturing figures stay separate. Parent totals and included projects are marked so they are never counted twice.

Utility-delivered contracted generationOak Ridge, Tennessee / TVA grid

Google–TVA–Kairos Hermes 2 project

Google + TVA + Kairos Power · 50 MW

Fuel / technology
Advanced nuclear
Status
Planned
Timeline
Power targeted beginning in 2030
Scope
TVA-grid supply for Google data centers in Montgomery County, Tennessee, and Jackson County, Alabama

This is a utility-delivered project, not a generator located at either data-center campus.

Google · first Kairos/TVA project

Scheduled generating projects.

June 2026 EIA schedule for 2026-07 through 2027-06. Generation and storage form one technology split; construction and earlier-stage status form a second overlapping split. They are not added across axes.

Scheduled plants
2
Scheduled units
3
Plant producer classes
Electric Utility
Total net summer
689.5 MW
Generation
669.5 MW
Storage power
20 MW
Construction / complete
689.5 MW
Earlier stage
0 MW
Schedule window
2026-122026-12
EIA plant 3399TN

Cumberland (TN)

  • 669.5 MW net summer669.5 MW generation · 0 MW storage power
  • 669.5 MW construction / complete0 MW earlier stage · overlapping status axis
Units
2 · CTG1, STG1
Nameplate
777.8 MW
Technology
Natural Gas Fired Combined Cycle
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗
EIA plant 64255TN

Vonore Battery Energy Storage System

  • 20 MW net summer0 MW generation · 20 MW storage power
  • 20 MW construction / complete0 MW earlier stage · overlapping status axis
Units
1 · VBESS
Nameplate
20 MW
Technology
Batteries
Schedule
2026-122026-12

(U) Under construction, less than or equal to 50 percent complete

Preliminary scheduled capacity is not guaranteed completion, expected MWh, a data-center allocation, or proof of a power contract.

EIA Table 6.5 workbook ↗