Georgia Power 2028–2031 certified capacity portfolio
Georgia Power / Georgia PSC · 9,885 MW
- Fuel / technology
- Mixed portfolio: gas combined cycle / combustion turbines, batteries, solar plus batteries, and PPAs; not one fuel or generator
- Status
- PSC-certified portfolio
- Timeline
- Commercial-operation dates run from November 2027 through December 2030; certification orders issued in December 2025
- Scope
- Georgia Power retail and regional resource portfolio responding to large-load growth; it is not dedicated to one operator
The PSC reports 9,885 MW total certified capacity, including 8,500 MW approved in the 2025 IRP plus previously approved generation. It is not all newly built supply, a data-center allocation, or actual load.
Georgia PSC 2025 annual report, p. 19 · dockets 56298 / 56310 ↗