Source-linked data-center relationshipU.S. EIA-861 2024 census respondent
Dominion Energy Virginia: source-linked data-center energy relationships, projects, capacity stages, roles, and original documents in Cloud Draw.
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider · Utility / power supplier
Country / scope
United States
Published geography
North Carolina · Virginia
Evidence checked
Aug 30, 2026
Identity and evidence classes.
Official source identifiers join records when available. Similar labels, brands, establishments, subsidiaries, parents, and affiliates remain separate until a source establishes the relationship.
Cloud Draw energy ID
curated:dominion-energy-virginia
EIA-861 utility ID
19876
Record classes
Source-linked data-center relationship · U.S. EIA-861 2024 census respondent
Source-established role / class
Generator / project developer · Electric utility reporting entity · EIA-861 respondent record · Distribution provider · Transmission provider · Utility / power supplier
Original-source routes
2
U.S. provider census record.
EIA-861 is the annual respondent spine. Detailed activities are absent for short-form respondents; a county territory means distribution equipment is present somewhere in that county, not exclusive or address-level service.
Form EIA-861 and EIA-861S provide the annual census frame of U.S. electric utilities, distribution utilities, and power marketers. County keys preserve the exact published State|County service-territory values for discovery; they are not an address, an exclusive franchise boundary, or proof that the organization serves a specific data center, has available capacity, or holds a current site contract.
Operating, construction, contracted, approved, framework, forecast, and manufacturing figures stay separate. Parent totals and included projects are marked so they are never counted twice.
Regional metered-load forecastDominion Virginia service territory
Dominion Virginia data-center load forecast
Dominion Energy Virginia / Virginia SCC record · 1,972 → 7,239 MW
Fuel / technology
Utility system portfolio; no dedicated facility generation assigned
Status
Utility forecast in regulatory record
Timeline
1,972 MW metered data-center load in 2023; 7,239 MW projected for 2035
Scope
Customer-class regional load, not one campus and not generation nameplate